Phase I Existing Conditions Assessment of Building 240, Fort Sam Houston, Texas

Year: 2009

Summary

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard operating procedures (SOPs) for the appropriate processes to be used for assessing historic properties.

To develop the ECA, CH2M HILL reviewed existing building records, drawings, and archival information. In addition, a site visit was conducted to visually assess the structural, mechanical, electrical, architectural, and environmental conditions as well as the historic integrity of Building 240.

Cite this Record

Phase I Existing Conditions Assessment of Building 240, Fort Sam Houston, Texas. 2009 ( tDAR id: 436411) ; doi:10.48512/XCV8436411

Spatial Coverage

min long: -98.471; min lat: 29.442 ; max long: -98.402; max lat: 29.484 ;

Individual & Institutional Roles

Contact(s): Cultural Resource Office, Joint Base San Antonio

Repository(s): Fort Sam Houston

Prepared By(s): CH2M HILL

Submitted To(s): US Army Corps of Engineers, Fort Worth District

Record Identifiers

Task Order(s): 008

Contract Number(s): W9126G-06-D-0400

File Information

  Name Size Creation Date Date Uploaded Access
2009-FSH-B240-Existing-Condition-PhI.pdf 19.79mb Jun 18, 2017 1:36:30 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Cultural Resource Office, Joint Base San Antonio