This report is a Maryland Inventory of Historic Properties Archeological Site Survey, Basic Data Report for the site T16, 18CH228. This site is located on the east side of Cedar Point Neck, 200m west of the Potomac, and about 1.3 km north of Upper Cedar Point. The site is in a disced firebreak and is bisected by a road. This prehistoric lithic scatter extends for some 2,000 feet along a facility access road. Prehistoric artifacts were discovered in disced firebreaks which parallel the road...
Maryland Inventory of Historic Properties, Archeological Site Survey, Basic Data Report, Site 18CH229, BPI_0087 (1980)
This report is a Maryland Inventory of Historic Properties Archeological Site Survey, Basic Data Report for the site T17, 18CH229. This site is located on the east side of Cedar Point Neck, 200m west of the Potomac, and about 1.3 km north of Upper Cedar Point. The site is in a disced firebreak and is bisected by a road. This historic artifact scatter has a similar spatial distribution as site 18CH228. No structure or dense concentrations of material were noted. As historic artifacts were...
Maryland Inventory of Historic Properties, Archeological Site Survey, Basic Site Report, Site 18CH221, Kings Creek Farm, BPI_0080 (1980)
This report is a Maryland Inventory of Historic Properties Archeological Site Survey, Basic Data Report for the site T9, Kings Creek Farm, 18CH221. This site is located west of Blossom Point Road on Cedar Point Neck, about 2 miles north of the tip of Blossom Point. It lies in a dirt roadbed. This sparse historic artifact scatter probably represents the former locus of a brick farmhouse or outbuilding associated with the Kings Creek Farm, once occupied by a George Brown. This building was...
Memoranda and Letters Between the US Army Electronics Research and Development Command, US Army Materiel Development and Readiness Command, Building Technology Inc. and the Envirosphere Company, Historic Properties Report (1983)
US Army memoranda and letters between Army personal, Building Technologies Inc. and Envirosphere Company members concerning the Historic Properties report for Harry Diamond Laboratories and the Ballast House.
Memoranda from U.S. Army Electronics Research and Development Command and U.S. Army Materiel Development and Readiness Command, Ballast House (1981)
Memoranda of record between Stanley H. Fried, Chief of the Real Estate Branch for the Engineer Division and F.W. Thomas, Director of the Installations & Services Directorate in regards to how the Ballast House will be torn down. A response from F.W. Thomas is included.
Memorandum for Record for Delta Training Exercise Program at Blossom Point (1995)
Memorandum for Record in reference to the Delta Training Exercise program at Blossom Point. The memorandum documents the program requirements for the Delta program and recommends land use justification and determination.
Memorandum for Record from Environmenta/Energy Branch, Visit to the Ballast House (1984)
A memorandum for record of the meeting conducted on 23 October 1984 with Harry Diamond Laboratories, a member from HQ, AMC, and a new member of the National Council of Historic Properties about the Ballast House. Included are recommendations to move forward with the Ballast House, and who the interested parties are to conduct operations on the Ballast House.
Memorandum for Record from ERADCOM, Ballast House Meeting Minutes (1984)
A memorandum for record for the Ballast House June 27, 1984 meeting minutes between the Maryland Historical Trust, Harry Diamond Laboratories, and the Electronics Research and Development Command (ERADCOM) regarding cliff stabilization and new Memorandum of Agreement.
Memorandum for Record from John Ganz, Ballast House (1984)
A memorandum of record for the conversations between John Ganz and members of the Maryland Historical Trust. The memorandum records the renegotiation's of the stipulations created for the Ballast House in the 1979 Memorandum of Agreement, what stipulations have been met, and what cannot be met due to budgetary issues.
Memorandum for Record from John Ganz, Meeting on Ballast House (1984)
Memorandum for record about the 27 June 1984 meeting and a report of the members involved.
Memorandum for Record from the Chief of the Environmental/Energy Conservation Branch, Ballast House Meeting (1984)
Memorandum for Record of what was discussed in regards to the Ballast House from the meeting of 27 June 1984. Discussions at the meeting pertained to recommendations concerning the Ballast House and what actions are needed to be taken. List of attendees is attached.
Memorandum for the Review of the Consumer Product Safety Commission and the Environmental Assessment of the Blossom Point Field Test Facility (1995)
A memorandum for distribution regarding review of the Consumer Product Safety Commission Environmental Assessment at Blossom Point Field Test Facility. Included are the appendices A-C of the aforementioned assessment.
Memorandum from Adelphi Laboratory Center to U.S. Army Corps of Engineers, Baltimore District, Environmental Assessment (1991)
A memorandum for the Commander of the US Army Corps of Engineers, Baltimore District in reference to a telephone conversation on 3 May 1991. Enclosed with the memorandum is the Environmental Assessment and related documents for the marketing/disposal of the Blossom Point Farmhouse.
Memorandum from Col James E. Hays to Edward T. Watling, With Reply, Relocation of Historic Ballast House, Harry Diamond Laboratories, MD (1980)
Various memorandums referencing a project reconsideration on the future of the Ballast House and a reply from William W. Pearce, Chief, Facilities Branch Engineer Division.
Memorandum from Col. James E. Hays to Edward T. Watling, Relocation of Historic Ballast House, Harry Diamond Laboratories, MD (1980)
Multiple letters regarding the relocation of the Historic Ballast House at the Harry Diamond Laboratories. The letters Include responses from the Office of Chief of Engineers, along with an annotated copy.
Memorandum from FONCON to CEHSC-FN and letter from the Office of Preservation Services, Blossom Point Farm Relocation (1991)
A memorandum for CEHSC-FN in reference to a proposal for use of legacy funds in cooperative effort to move the Blossom Point Farmhouse. Also included is a partial response from the Administrator from Archaeological Services, Office of Preservation.
Memorandum from Gary P. George to F.W. Thomas, Relocation of Historic Ballast House, Harry Diamond Laboratories, Adelphi, MD (1980)
The memorandums of record is a correspondence between Gary P. George, Acting Director of Installations & Services Directorate and F.W. Thomas, Director of Installations & Services Directorate in regards to the dismantling of the Ballast House and a possible contact for the action.
Memorandum from Harry Diamond Laboratories to US Army DARCOM Installations and Services Activity, Ballast House Protection (1978)
The Harry Diamond Lab (HDL) Environmental Coordinator is planning to authorize, during FY79, a partial archeological and historical survey of the Blossom Point, Maryland site to more clearly identify the historical significance of the old house. Additional memoranda and Request for Preparation forms are included.
Memorandum from Harry Diamond Laboratories to US Army Research Laboratories, Blossom Point (1989)
Memorandum from the Harry Diamond Laboratories to the US Army Research Laboratories in regards to the Ballast House at Blossom Point, Maryland. The Memorandum is attached with Fax from Paul McGuff of the US Army Corps of Engineers, Fort Worth District with information concerning the 1 August 1989 meeting.
Memorandum from Headquarters, U.S. Army Adelphi Laboratory Center to U.S. Army Laboratory Command, Review of Memorandum of Agreement (1990)
Memorandum in response to the review of the Memorandum of Agreement for the Blossom Point Farmhouse.
Memorandum from National Park Service to Mr. Rodney Metzger, Historic Structures Inventory (1983)
A short memorandum from Robie S. Lange from the National Park Service, Washington, DC, to Rodney Metzger concerning work done for the Department of Army Materiel Development & Readiness Command (DARCOM) Historic Structure Inventory.
Memorandum from the Adelphi Laboratory Center to the U.S. Army Corps of Engineers, Baltimore District (1991)
Memorandum from the Adelphi Laboratory Center to the US Army Corps of Engineers, Baltimore District regarding a request for design services at the Blossom Point Farm House.
Memorandum from the Adelphi Laboratory Center to the U.S. Army Materiel Command, Marketing/Disposal Blossom Point Farmhouse (1991)
A memorandum for the U.S. Army Materiel Command requesting marketing and disposal report for the Blossom Point Farmhouse.
Memorandum from the Chief of Engineering and Housing Division to Directorate of Facilities Engineering, Review and Comments Environmental Assessment (1991)
A memorandum for the Directorate of Facilities Engineering in regards to the review and comments of the environmental assessment of the Ballast House, in addition to related documents for the marketing and disposal of the Blossom Point Farmhouse.
Memorandum from the Division of Public Works to the Public Affairs Office, Request Release of Environmental Assessment (1995)
Memorandum for the Chief of Public Affairs Office requesting for the public release of environmental assessment of the Blossom Point Field Test Facility Training Area. Enclosed is a summary sheet with background information about the establishment of training areas within the Field Test Facility. Following the summary sheet is the Environmental Assessment of the US Army Blossom Point Field Test Facility Training Area as well as a map of the assessed areas of the Training Facility.