Gold Mica (Material Keyword)
1-2 (2 Records)
The Salt River Project (SRP) and Arizona Public Service Company (APS) constructed three transmission lines along a portion of the Beeline Highway on the Salt River Pima-Maricopa Indian Community (SRPMIC). SRP proposed to build a new line that connects the Pinnacle Peak, Brandow, and Papago Buttes substations. At the same time, APS proposed to realign two existing transmission lines and move them out of the Salt River channel and onto the north terrace above the river. Prior to construction,...
Final Report for Plan 6 Supplemental Cultural Resource Surveys (1985)
This final report reflects a year of on-call Class III cultural resource surveys for Plan 6, the Regulatory Storage Division of the Central Arizona Project. Included are eight reports representing close to 6000 acres of survey performed in the vicinity of the planned New Waddell Dam by Archaeological Consulting Services for the Arizona Projects Office, U.S. Bureau of Reclamation. Because New Waddell Dam is designed to be rock filled, one of the focal points of the contract was to survey proposed...