Silver Mica (Material Keyword)

1-1 (1 Record)

The Beeline Archaeological Project (1990)
DOCUMENT Full-Text Richard W. Effland. Scott Fedick.

The Salt River Project (SRP) and Arizona Public Service Company (APS) constructed three transmission lines along a portion of the Beeline Highway on the Salt River Pima-Maricopa Indian Community (SRPMIC). SRP proposed to build a new line that connects the Pinnacle Peak, Brandow, and Papago Buttes substations. At the same time, APS proposed to realign two existing transmission lines and move them out of the Salt River channel and onto the north terrace above the river. Prior to construction,...