backstop berm (Material Keyword)

1-3 (3 Records)

F.E. Warren AFB Project Metadata
PROJECT Uploaded by: Rachel Fernandez

Metadata for the F.E. Warren AFB collection.


Peacekeeper Program Component Effect Report #3 Launch Facility Trainer (1986)
DOCUMENT Full-Text Norton Air Force Base.

This report covers the Launch Facility {LF) Trainer Component of the Peacekeeper Program. As currently sited, this facility will be constructed within the boundaries of the F.E. Warren Air Force Base Historic District/National Landmark as well as within the site boundaries of Cheyenne Depot {48-LA-106), which has been determined eligible for listing in the National Register of Historic Places {NRHP). Based on the results of archeological and architectural onsite survey, the Air Force, in...


Peacekeeper Program: Preliminary Component Effect Report, Energy Management and Control System, F.E. Warren Air Force Base, Wyoming (1985)
DOCUMENT Full-Text Tetra Tech Inc..

As outlined in the Peacekeeper Program Cultural Resources Management Plan (U.S. Air Force 1984), the Air Force is preparing a series of Component Effect Reports (CERs) covering proposed actions required for system deployment. This document is an abbreviated report reviewing the Energy Management and Control System (EMCS) prior to the 30% design review. A complete CER will be produced after 30% design review when final plans are available. The EMCS component consists of installing fiber optic...