Baling Wire (Material Keyword)

1-3 (3 Records)

Cultural Resource Inventory Report: Electrical Distribution System Repair, F.E. Warren Air Force Base, Wyoming (1985)
DOCUMENT Full-Text William Metz.

On 31 May 1985, a small historic trash scatter was exposed in a construction trench associated with the project to repair the electrical distribution system on F.E. Warren AFB. This scatter is located immediately beneath an existing sidewalk near Building 298. The site may be the result of secondary redeposition associated with construction of building 298. Due to the location of the site within the Ft. D.A. Russell Historic District, it should be considered as an eligible component of the...


F.E. Warren AFB Project Metadata
PROJECT Uploaded by: Rachel Fernandez

Metadata for the F.E. Warren AFB collection.


Results of a Class III Cultural Resource Inventory Happy Jack Road Wyoming Project M-4006 (1985)
DOCUMENT Full-Text David Eckles. Skylar S. Scott.

A cultural resource inventory was conducted by the Office of the Wyoming State Archeologist on the proposed Happy Jack Road at the request of the Wyoming Highway Department. David G. Eckles served as principal investigator and field director for this project. David Reiss and David Eckles performed the survey. Field investigations were conducted on March 20, 1985. The proposed highway right-of-way is 1.4 mi in length and is 600 ft in width. Legal descriptions of all affected areas are as follows...