APS (Other Keyword)

1-7 (7 Records)

Archaeological Investigations: Arizona Nuclear Power Project, BLM and Private Land, Maricopa County, Arizona: Final Report for Palo Verde Nuclear Generating Station Waste Water Conveyance System (1977)
DOCUMENT Full-Text Pat H. Stein.

This report attempts to document, assess, and develop a plan for conserving archaeological resources along the waste water conveyance system for the Arizona Nuclear Power Project. The paper describes 13 sites which were discovered during an intensive survey of the proposed facility, evaluates these sites in relation to the archaeological resource base of the Lower Gila River Valley, and recommends procedures for mitigating the adverse effects of construction on these cultural remains. The survey...


Archaeological Surveys of Access Roads for APS and SRP Towers: APS 263-286 (Inclusive) 302, SRP 263-285 (Inclusive) 302, Additional Survey: Realignment of F. S. Road 202 East of the Q Ranch for the APS Cholla-Saguaro 500 kV Transmission Line (1977)
DOCUMENT Full-Text Linda Mayro.

An archaeological clearance survey has been carried out on a portion of land managed by Tonto National Forest for proposed tower access roads. These access roads are being constructed by Arizona Public Service for the proposed APS Chollo-Saguaro 500 kV Transmission Line. The archaeological surveys were performed in accordance with the interim survey procedures outlined in the October 13, 1976 letter by Martin McAllister. It states that "access roads (14 feet wide) and a buffer zone of 50 feet...


Archaeological Surveys of Tower Changes and Additional Access Road Spurs, APS Towers 287, SRP Towers 286, 106, 107, 108: For the APS Cholla-Saguaro 500 kV Transmission Line Crossing the Apache-Sitgreaves and Tonto National Forests, Arizona (1977)
DOCUMENT Full-Text Linda Mayro.

An archaeological clearance survey has been carried out on a portion of land managed by Apache-Sitgreaves and Tonto National Forests for proposed tower changes on the Cholla-Saguaro 500 kV Transmission Line. The archaeological surveys were performed in accordance with the interim survey procedures outlined in the October 13, 1976 (2720/2360/ File) letter by Martin McAllister. It states that "access roads (14 feet wide) and a buffer zone of 50 feet on each side of the road will be surveyed"...


Archeological Investigations: Salt River Project, Coronado - Silverking Transmission Line 2 3/4 Mi. Segment of APS-SRP Common Corridor, Federal Land, Navajo County, Arizona: Report for Archeological Survey of the Proposed Coronado-Silverking Transmission Line 2 3/4 mi. Segment of APS-SRP Common Corridor (1978)
DOCUMENT Full-Text Dana Hartman.

Salt River Project (SRP) recently assumed responsibility for the construction of a 2 3/4 mile segment of the Coronado-Silverking APS-SRP Common Corridor Transmission Line. Due to this change in construction plans, Bettina Rosenberg, SRP Archeological Administrator, contacted the Museum of Northern Arizona (MNA) on November 30, 1977, and requested a resurvey of the tower locations on this portion of the transmission line. The line was originally surveyed by Arizona State Museum (ASM), but the...


The Beeline Archaeological Project (1990)
DOCUMENT Full-Text Richard W. Effland. Scott Fedick.

The Salt River Project (SRP) and Arizona Public Service Company (APS) constructed three transmission lines along a portion of the Beeline Highway on the Salt River Pima-Maricopa Indian Community (SRPMIC). SRP proposed to build a new line that connects the Pinnacle Peak, Brandow, and Papago Buttes substations. At the same time, APS proposed to realign two existing transmission lines and move them out of the Salt River channel and onto the north terrace above the river. Prior to construction,...


Research Design for Data Recovery for the Salt River Project and Arizona Public Service Transmission Line Facilities Along the Beeline Highway (1985)
DOCUMENT Full-Text Richard W. Effland, Jr..

Salt River Project (SRP) and Arizona Public Service Company (APS) propose to construct three transmission lines along a portion of the Beeline Highway on the Salt River Pima-Maricopa Indian Community (SRPMIC). SRP proposes to build a new line which will connect the Pinnacle Peak, Brandow, and Papago Butte substations. APS proposes to realign two existing transmission lines and move them out of the Salt River channel and onto the north terrace above the river. Archaeological Consulting Services...


Standing for More than a Century: Theodore Roosevelt Dam and SRP (2011)
DOCUMENT Full-Text Uploaded by: Katelyn Roessel

Water and power are foundational building blocks for the continual development of the greater Phoenix metropolitan area. On March 18, 1911, Theodore Roosevelt Dam was dedicated and the cornerstone was set for dependable water and power to the Salt River Valley. The vital resources from the dam now reliably serve one of the nation’s largest metropolitan areas. Standing for More Than a Century simultaneously celebrates Roosevelt Dam’s centennial and illustrates significant events in the Valley’s...