Navajo Generating Station (Other Keyword)

1-6 (6 Records)

Archaeological Survey of Two Parcels at Navajo Generating Station and the SRP/PWCC Coal Loading Station, Coconino and Navajo Counties Arizona (2017)
DOCUMENT Full-Text Kimberly Spurr.

Past Peoples Consulting, LLC, was requested by Salt River Project Agricultural Improvement and Power District (SRP) to complete a pedestrian survey to identify and evaluate cultural resources at two facilities in northern Arizona. One survey parcel was within the boundary of the Navajo Generating Station near Page and the second parcel was within the fenced boundary of the SRP/Peabody Western Coal Company (PWCC) Coal Loading Station near Kayenta. Fieldwork took place between March 26 and 30,...


A Class I Cultural Resource Records Review for the Navajo Generating Station Water Intake Maintenance Project near Page, Coconino County, Arizona (2004)
DOCUMENT Full-Text Jodi Strohmayer.

SRP proposes to undertake a maintenance project on the water intake system for the Navajo Generating Station (NGS) near Page, Coconino County, Arizona (Figure 1). The purpose of the project is to ensure the future availability of cooling water for NGS operations due to the continuing decrease of the water surface elevation of Lake Powell associated with the ongoing drought. The full pool elevation of Lake Powell is 3,700 feet above sea level. Current projections indicate the lake surface...


A Cultural Resources Survey for Proposed Road Improvements Along State Route 98 South of the Navajo Generating Station on the Navajo Indian Reservation near Page, Arizona (1994)
DOCUMENT Full-Text Lynn A. Neal.

On April 29, 1994, Lynn Neal of SWCA, Inc., Environmental Consultants conducted an archaeological survey of 25.6 acres (10.4 ha) along State Route 98 near Page, Arizona, at the request of Dr. Judy Brunson-Hadley, SRP Archaeologist. SRP is the contact and funding agency. No cultural resources were identified.


An Environmental Statement of A Proposal to Construct Two 500 kV Powerlines Across National Forest Land by the Arizona Public Service Company (1971)
DOCUMENT Full-Text U. S. Department of Agriculture, Forest Service.

Arizona Public Service Company, a member of the Western Energy Supply and Transmission Associates (WEST), is responsible for the construction and maintenance of two 500,000 volt transmission lines from the Navajo generating plant (now being constructed 4 miles east of Page, Arizona) to Phoenix, Arizona. The Company submitted a proposed right-of-way location for the transmission line route to the Forest Service for study and review. Upon receipt of this proposal Southwestern Regional Forester...


Navajo Generation Station at Page, Arizona, Preliminary Report (1969)
DOCUMENT Full-Text Peter J. Pilles.

An archaeological investigation of the proposed Navajo Generation Station was conducted by the Museum of Northern Arizona from December 10 through 12, 1969, for the purpose of archaeological clearance. The Museum was represented by Alexander J. Lindsay, Jr., Curator of Anthropology, and Peter J. Pilles, Jr., Salvage Archaeologist, who found five prehistoric sites and two modern Navajo sites during the course of the survey. This proposed facility is a large steam operated electrical generation...


The Story of SRP: Water, Power, and Community (2017)
DOCUMENT Full-Text Uploaded by: Katelyn Roessel

This is, in the end, the story of those who call the Valley of the Sun home. From its earliest conception, SRP was created by—and for—the communities it serves. Over time, SRP’s water and power services have helped ensure the successful achievement of its original purpose: the economic development of the Valley and the region. When the Association was formed in 1903, the population of Maricopa County was barely twenty thousand. On his visit to the Valley just eight years later for the dedication...