Archaeological Fieldwork (Other Keyword)

1-6 (6 Records)

Archaeological Collection Sampling and Discard Protocols (Legacy 16-789)
PROJECT Brian Crane.

This project developed guidance on how to slow the growth in volume of materials requiring long-term curation and allow for future efficient management of collections of undetermined, little or no research potential. Guidance is given to relate collection management plans to associated project research designs. These guidelines should be distributed to DoD cultural resources subject matter experts and cultural resources managers for implementation. The best practices presented would be...


Archaeological Collection Sampling and Discard Protocols - Report (Legacy 16-789) (2018)
DOCUMENT Full-Text Brian Crane.

This report provides guidance on how to slow the growth in volume of materials requiring long-term curation and allow for future efficient management of collections of undetermined, little or no research potential.


Archaeological Site Evaluation, Phase II, Elmendorf Air Force Base (2010)
DOCUMENT Full-Text Stephen Weitzman. Phyllys Callina. Kristina Neptune. Jennifer Wehrmann.

The United States Air Force, 3rd Civil Engineer Squadron contracted Jacobs Engineering Group, Inc. (Jacobs) to perform archaeological evaluations of recorded historic and prehistoric sites on Elmendorf Air Force Base. Jacobs conducted a Level II: Evaluation Phase Archaeological Survey. A site visit and general survey was conducted on June 2 and 3, 2009. Archaeological sites surveyed include ANC-00430, ANC-00431, ANC-00432, ANC-00443, ANC-00839, ANC-00840, ANC-00841, ANC-00912, and ANC-01073....


Cultural Resource Survey, ML&P Fossil Creek Switchyard and Right-of-Way Corridor, Joint Base Elmendorf-Richardson, Alaska (2013)
DOCUMENT Full-Text Sarah R. Corbin. Mark S. Cassell. Adam C.F. Cox.

This report provides the Bureau of Land Management (BLM) with the results of a cultural resource survey conducted for the proposed Municipal Light & Power Fossil Creek switchyard and right-of-way corridor project on Joint Base Elmendorf-Richardson, Alaska by Territory heritage Resource Consulting (THRC) in July 2012 and July 2013. This document also includes communication between the Bureau of Land Management and the Alaska State Historic Preservation Office.


Cultural Resources Survey for Watershed Enhancements at Joint Base Elmendorf-Richardson (Draft) (2013)
DOCUMENT Full-Text Edmund P. Gaines.

Joint Base Elmendorf-Richardson (JBER) had proposed to conduct watershed and fishery enhancement activities in the Otter Creek and Six mile Creek watersheds within the boundaries of the installation. The U.S. Army Corps of Engineers (USACE), on behalf of the 673d Civil Engineer Squadron, Environmental Conservation Section, contracted AECOM Technical Services (AECOM) to perform cultural resources surveys of the project's APE at Otter Creek and six mile Creek. This document details those surveys.


Joint Base Elmendorf-Richardson Resources
PROJECT Uploaded by: Rachel Fernandez

Project metadata for resources within the Joint Base Elmendorf-Richardson cultural heritage resources collection. This project is used to fill metadata for all resources part of the Joint Base Elmendorf-Richardson collection.