Mueller Little House (Site Name Keyword)

376-400 (667 Records)

5MT10631, Photo #23960, Plan view, excavation in progress (2016)
IMAGE Rebecca (Becca) Simon.

Overview of features in Surface 1 in the southeast quadrant of Structure 101 (pithouse main chamber) in relation to each other.


5MT10631, Photo #23961, Plan view, feature before excavation (2016)
IMAGE Shanna Diederichs.

Feature 2 in Surface 1 of 2-x-2-m unit 1356.N 2471.5E.


5MT10631, Photo #23962, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Identifying possible capping of Feature 35 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber). Excavation in progress.


5MT10631, Photo #23963, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Identifying possible capping of Feature 35 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber). Excavation in progress.


5MT10631, Photo #23964, Profile view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Identifying possible capping of Feature 35 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber). Excavation in progress.


5MT10631, Photo #23965, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Identifying possible capping of Feature 35 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber). Excavation in progress.


5MT10631, Photo #23966, Profile view, stratigraphy (2016)
IMAGE Shanna Diederichs.

Final stratigraphic profile, 2-x-2-m unit 1356N 2471.5E, showing modern ground surface, stratum 1, Surface 1, stratum 2, Feature 2, and window on the east end. In the background there is the backfill pile for all units.


5MT10631, Photo #23967, Plan view (2016)
IMAGE Shanna Diederichs.

Feature 2 in Surface 1 in 2-x-2-m unit 1356N 2471.5E, with bracing stones.


5MT10631, Photo #23968, Plan view (2016)
IMAGE Shanna Diederichs.

Feature 2 in Surface 1 in 2-x-2-m unit 1356N 2471.5E, with bracing stones.


5MT10631, Photo #23969, Profile view, stratigraphy (2016)
IMAGE Rebecca (Becca) Simon.

Final stratigraphic profile, 2-x-2-m unit 1356N 2471.5E, showing modern ground surface, stratum 1, Surface 1, and stratum 2. Close-up of west end to note plow scrape and undisturbed native sediment underneath.


5MT10631, Photo #23970, Profile view, stratigraphy (2016)
IMAGE Shanna Diederichs.

Final stratigraphic profile, 2-x-2-m unit 1359N 2471.5E, showing modern ground surface and stratum 1.


5MT10631, Photo #23971, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Feature 35 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber) in relation to Features 14 and 15.


5MT10631, Photo #23972, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Feature 35 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber), close-up.


5MT10631, Photo #23973, Plan view, feature before excavation (2016)
IMAGE Shanna Diederichs.

Feature 33 in Surface 1 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23974, Plan view, feature before excavation (2016)
IMAGE Shanna Diederichs.

Feature 33 (deconstructed bin wall trenches) in Surface 1 of the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23975, Plan view, feature before excavation (2016)
IMAGE Shanna Diederichs.

Feature 33 (deconstructed bin wall trenches) in Surface 1 of the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23976, Plan view, feature before excavation (2016)
IMAGE Shanna Diederichs.

Feature 33 (deconstructed bin wall trenches) in Surface 1 of the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23977, Plan view, feature before excavation (2016)
IMAGE Shanna Diederichs.

Feature 33 (deconstructed bin wall trenches) in Surface 1 of the southeast quadrant of Structure 101 (pithouse main chamber). Close-up of northern trench.


5MT10631, Photo #23978, Plan view, feature before excavation (2016)
IMAGE Shanna Diederichs.

Feature 33 (deconstructed bin wall trenches) in Surface 1 of the southeast quadrant of Structure 101 (pithouse main chamber). Close-up of western trench.


5MT10631, Photo #23979, Plan view, feature before excavation (2016)
IMAGE Shanna Diederichs.

Feature 33 (deconstructed bin wall trenches) in Surface 1 of the southeast quadrant of Structure 101 (pithouse main chamber). Close-up of northern trench.


5MT10631, Photo #24002, Profile view, feature (2016)
IMAGE Rebecca (Becca) Simon.

View of Feature 1 in the southeast quadrant of Structure 101 (pithouse main chamber), looking into Structure 102 (pithouse antechamber).


5MT10631, Photo #24003, Profile view, feature (2016)
IMAGE Rebecca (Becca) Simon.

View of Feature 1 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #24004, Profile view, feature (2016)
IMAGE Rebecca (Becca) Simon.

View of Feature 1 in the southeast quadrant of Structure 101 (pithouse main chamber). Close-up of plaster and construction materials.


5MT10631, Photo #24005, Profile view, feature (2016)
IMAGE Rebecca (Becca) Simon.

View of Feature 1 in the southeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #24006, Profile view, feature (2016)
IMAGE Rebecca (Becca) Simon.

View of Feature 1 in the southeast quadrant of Structure 101 (pithouse main chamber).