AR-03-03-05-218 (Site Name Keyword)
1-4 (4 Records)
It was determined that a portion of subject project was not in compliance. Clearance had been obtained previously for the High Energy Research and Technology Facility (HERTF) Site proper. However, the Department of Defense (DOD) constructed the 46KV powerline prior to obtaining clearance. Areas involved in the powerline construction and access were systematically walked and visually inspected. Alignments were considered to be approximately 50 feet wide and were surveyed in strips 15-20 apart....
Kirtland Air Force Base Project Metadata
Project metadata for resources within the Kirtland Air Force Base cultural heritage resources collection.
USDA Forest Service Inventory Standards and Accounting Form: Department of Defense High Energy Research and Technology Facility (HERTF) Powerline and Communication Line (1990)
A project to construct a powerline and communication line to serve the Department of Defense High Energy Research and Technology Facility (HERTF) Site was found to be out of compliance viz, construction having been initiated prior to obtaining Cultural Clearance. A cultural resources survey was done on approximately 15 acres. Two prehistoric sites and one historic site were encountered for which project plans were changed to avoid. Cultural resources clearance is recommended.
USDA Forest Service Inventory Standards and Accounting Form: High Energy Research and Technology Facility (HERTF) Buried Cable (1993)
A survey was done on 6 acres of the Sandia District of the Cibola National Forest on the Military Withdrawal for a project to install a fiber optic cable. Two Sites were relocated, AR-03-03-05-218 and AR-03-03-05-219 and the project was route~ around them. The Sites will not be impacted by the project. Two isolated finds were located and described: IF-1 and IF-2.