AZ U:10:275(ASM) (Site Name Keyword)

1-3 (3 Records)

Class III Cultural Resource Inventory of 191.7 Acres for the Salt River Project Southeast Power Link 230kV Transmission Line in the Cities of Mesa and Queen Creek, Maricopa County, Arizona (2022)
DOCUMENT Full-Text Matthew Steber. Jennifer Deats.

PaleoWest, LLC (PaleoWest) is under contract to Salt River Project (SRP) to conduct a Class I literature review for 203.5 acres of private and ASLD land (Project area), and a Class III cultural resource inventory of 191.7 acres of private land (Survey area) in the Cities of Mesa and Queen Creek, within Maricopa County, Arizona (Project). The remaining Project acreage consists of ASLD land, which was previously surveyed by Northland Research, Inc. in 2019. Of the 191.7-acre Survey area, a total...


A Class III Cultural Resources Survey for the Union Pacific Railroad Company Pecos Industrial Rail Access and Train Extension (PIRATE) Project, Mesa and Queen Creek, Maricopa County, Arizona (2022)
DOCUMENT Full-Text Pamela J. Rainey. Michael Stubing.

Revised November 2022. UP is seeking authority from the Board to construct and operate approximately 6.0 miles of new rail line in Maricopa County, Arizona (Docket No. FD 36501). The proposed rail line would connect UP’s Phoenix Subdivision main line track to industrial properties southeast of the Phoenix-Mesa Gateway Airport via a single-track rail line accompanied by segments of support track. UP also proposes to construct and operate approximately 4.0 miles of new support track along the...


A Historic Properties Treatment Plan for Four Prehistoric Sites Along the Salt River Project's Proposed Southeast Power Link 230kV Transmission Line Corridor, Maricopa County, Arizona (2022)
DOCUMENT Full-Text Sebastian Chamorro. Angela Huster.

Salt River Project (SRP) is proposing to construct a new 230kV transmission line in Maricopa County, Arizona (Project). The proposed Project entails the construction of seven miles of new overhead power lines that will follow a previously approved route. The proposed overhead transmission line will require the placement of 56 tubular steel pole structures. The corridor for the proposed Project varies between 100–205 feet (ft) wide. Additionally, a new 230/69kV receiving station will be built in...