AZ V:5:197(ASM) (Site Name Keyword)

1-3 (3 Records)

Class III Cultural Resources Survey of Approximately 4.3 Miles of the Horse Mesa Dam Road (FR 80), from the Apache Trail to Horse Mesa, Tonto National Forest, Mesa and Tonto Basin Ranger Districts, Maricopa County, Arizona (2020)
DOCUMENT Full-Text Branden R. Fjerstad. Annie Lutes. Jerome Hesse.

SRP uses FR 80 to access Horse Mesa Dam and associated facilities in eastern Maricopa County, Arizona. Also known as Horse Mesa Dam Road, FR 80 traverses rugged terrain between its point of origin at SR 88 and its terminus at the dam on the Salt River. The road requires periodic maintenance for its sustainable and safe use, and SRP intends to implement future road improvement projects in coordination with TNF. SRP contracted SWCA Environmental Consultants (SWCA) to conduct a Class III cultural...


Cultural Resources Monitoring of Roadway Improvements along Historic State Route 88 between Mileposts 203.40 and 220.20, Northeast of Apache Junction, Maricopa County, Arizona (2018)
DOCUMENT Full-Text Alexandra Howard. Nicole Webb.

FHWA and ADOT completed a roadway improvement project along Historic SR-88, also known as the Apache Trail, between MP 203.40 and MP 220.20, northeast of the town of Apache Junction, Maricopa County, Arizona. The undertaking included milling existing pavement and laying new pavement along SR-88 between MP 203.40 and 213.35; applying a double application of chip seal coat on the existing roadway between MP 213.35 and MP 220.20; removing the pavement at 5 existing pullouts; constructing new...


Salt River Project Forest 500 Vegetation Management Cultural Resources Data Comparison (2022)
DOCUMENT Full-Text Meghann M. Vance.

The Salt River Project (SRP) is planning to conduct 5-year vegetation management along their Coronado-Silvering 500 kV transmission line beginning in May 2022. The portion of the transmission right-of-way (ROW) that crosses Tonto National Forest (TNF)’s Tonto Basin and Pleasant Valley Ranger Districts will be subject to vegetation management during this cycle. The entire length of the proposed treatment corridor has been previously surveyed, with the most recent survey conducted by Logan...