Maricopa-Saguaro 115kV Transmission Line (Site Name Keyword)

1-1 (1 Record)

A Class III Cultural Resource Survey of the Proposed Desert Basin South Gas Pipeline, Casa Grande, Pinal County, Arizona (2000)
DOCUMENT Full-Text S. Jerome Hesse.

On September 25, 2000, SWCA, Inc. completed a Class ID cultural resources survey for an approximately 7-mile long gas pipeline alignment near Casa Grande, Pinal County, Arizona. The purpose of the survey was to determine if any cultural resources existed that may be adversely impacted by the installation and maintenance of a proposed gas pipeline from Reliant Energy's Desert Basin Generating Facility on Burris Road south approximately seven miles to an existing El Paso Natural Gas pipeline. This...