Buckley SFB Project Metadata
PROJECT Uploaded by: Rachel Fernandez

Project metadata for resources in the Buckley SFB collection.


Letter: Construction of a 100-Foot Telecommunications Facility, AT&T Mobility/BCKLY-005 (2020)
DOCUMENT Full-Text Holly Kathryn Norton. Steve Turner.

Letter from the State Historic Preservation Officer (SHPO), Steve Turner and Dr. Norton, History Colorado, responding to inquiry from the Installation Management Flight Chief, Buckley Air Force Base regarding Construction of a 100-Foot Telecommunications Facility, AT&T Mobility/BCKLY-005. The SHPO determined the proposed construction would have No Adverse Effect.


Letter: Visual and Auditory Effects Assessment: Installation of Five Telecommunications Facilities, Buckley Air Force Base, Arapahoe County, Colorado (2020)
DOCUMENT Full-Text .

A document addressed to Mr. Saldibar, regarding: correspondence received on September 28, 2020, requesting the visual and auditory effects assessment of historic properties within a half mile radius of the 100 foot tower (BCKLY-005) analyzed during the proposed Installation of an AT&T 5G Cellular Network Wireless at Buckley Air Force Base project. Each site in the Area of Potential Effect is analyzed and an effects determination is made.