Letter: Construction of a 100-Foot Telecommunications Facility, AT&T Mobility/BCKLY-005
Part of the Buckley SFB Project Metadata project
Author(s): Holly Kathryn Norton; Steve Turner
Year: 2020
Summary
Letter from the State Historic Preservation Officer (SHPO), Steve Turner and Dr. Norton, History Colorado, responding to inquiry from the Installation Management Flight Chief, Buckley Air Force Base regarding Construction of a 100-Foot Telecommunications Facility, AT&T Mobility/BCKLY-005. The SHPO determined the proposed construction would have No Adverse Effect.
Cite this Record
Letter: Construction of a 100-Foot Telecommunications Facility, AT&T Mobility/BCKLY-005. Holly Kathryn Norton, Steve Turner. 2020 ( tDAR id: 470905) ; doi:10.48512/XCV8470905
Keywords
Site Name
5AH.207
•
5AH.2274
•
5AH.2276
•
5AH.2296
•
5AH.2297
•
5AH.2298
•
5AH.2299
•
5AH.2306
•
5AH.2309
•
5AH.2333
•
5AH.2342
•
5AH.488
•
5AH.489
•
5AH.492
•
5AH.493
•
5AH.494
•
5AH.495
•
5AH.535
•
BCKLY-005
Investigation Types
Consultation
•
Heritage Management
General
AT&T Mobility/BCKLY-005
•
Buckley Air Force Base
•
Buckley Space Force Base
•
No Adverse Effect
•
Telecommunications Facility
Geographic Keywords
Arapahoe (County)
•
Aurora, CO
•
Colorado (State / Territory)
Spatial Coverage
min long: -104.796; min lat: 39.674 ; max long: -104.716; max lat: 39.733 ;
Individual & Institutional Roles
Contact(s): Buckley Space Force Base CRM Manager
Record Identifiers
History Colorado No.(s): HC #78494
File Information
| Name | Size | Creation Date | Date Uploaded | Access | |
|---|---|---|---|---|---|
| ID78494-12-2-20-Cell-Tower-Buckley-AFB.pdf | 573.63kb | Oct 11, 2022 1:08:30 PM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Buckley Space Force Base CRM Manager