Lastwater Ruin (Site Name Keyword)
1-3 (3 Records)
This is a letter report detailing the archaeological clearence and data recovery that will be done for the transmission line. There are 35 sites located on the Coolidge-Hayden and southern portion of the Superior-Hayden 115kV transmission lines (southeast of Tower 74. Of those 35 sites, four of them extend into both transmission rights-of-way. The attached list of the archaeological sites and identifies current plans and restrictions for construction activities in the vicinity of the sites....
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...