NA15,693 (Site Name Keyword)

1-5 (5 Records)

Archaeological Investigations, Salt River Project, Phoenix, Arizona: Investigations at Four Sites Along the Silver King to Kyrene, East End, Transmission Line, Coronado Generating Station Project, Tonto National Forest, Pinal County, Arizona: Final Report for Archaeological Investigations at Four Sites Along the SRP Silver King to Kyrene, East End, Transmission Line, Coronado Generating Station Project (1981)
DOCUMENT Full-Text Ronald K. Yablon. Donald E. Weaver, Jr..

The Museum of Northern Arizona investigated four sites along the Silver King to Kyrene, East End, Transmission System. NA15,693 is the remains of a portion of the Magma Arizona Railroad Company narrow gauge line and associated features. The line was used between 1915 and 1923 to haul freight, passengers, and mail between Superior and Webster (Magma Junction). NA15,718 includes the remains of several Salado field houses and associated agricultural features. The site occupants practiced a mixed...


Archaeological Investigations, Salt River Project, Silverking-to-Kyrene, East End, Transmission Line, Tonto National Forest, Pinal County, Arizona: Preliminary Report for Data Recovery Investigations at NA15,693 Along the Silverking-to-Kyrene, East End, Transmission Line (1978)
DOCUMENT Full-Text Ronald K. Yablon.

On September 21, 1978, the Museum of Northern Arizona conducted an archaeological investigation of site NA15,693, a narrow gauge railroad alignment originally recorded during surveys for the proposed Salt River Project (SRP) Silverking-to-Kyrene, East End, Transmission Line. Fieldwork was conducted by Ronald K. Yablon. The data recovery program for this site consisted of comprehensively photographing the grade and plotting the location of the still existing sections. The results of these studies...


Archaeological Investigations: Salt River Project Silverking-Kyrene Transmission Line, Tonto National Forest, Pinal County, Arizona: A Research Plan for Three Sites Along the Silverking-to-Kyrene, East End, Transmission Line, Tonto National Forest, Pinal County, Arizona (1978)
DOCUMENT Full-Text Ronald K. Yablon. Donald E. Weaver, Jr..

The research plan outlines a framework for investigating 3 archaeological sites along the Silverking-to-Kyrene, East End, Transmission Line, a part of the Coronado Project. The 3 sites, initially recorded during a recent survey by the Museum of Northern Arizona, are a large lithic scatter associated with linear rock alignments, a possible 1-room structure associated with linear rock alignments, and an abandoned railroad grade. The plan discusses specific means by which the scientific potential...


Archaeological Investigations: Salt River Project, Coronado-Silverking Transmission Line 500kV and 230kV Corridor Segment from Silverking Substation West to Tonto National Forest Boundary, Federal (Tonto National Forest) and Private Lands, Pinal County, Arizona: Final Report for Archaeological Clearance Survey of 14.8 mi of Extra High Voltage Transmission Line Corridor, 2.0 mi of Substation Access Road, and 0.9 mi of 115kV Transmission Line Alignment, Silverking Substation Area, Tonto National Forest (1978)
DOCUMENT Full-Text Donald Keller.

15 mi of Extra High Voltage transmission line corridor, 2 mi of access road, and 0.9 mi of 115kV transmission line from the Silverking Substation were surveyed for archaeological resources by the Museum of Northern Arizona in April, 1978. Twelve prehistoric and historic Anglo-American affiliation archaeological sites were identified along the EHV corridor between the Silverking Substation and the Tonto National Forest boundary. An isolated recent feature, not given a site designation, was found...


A Cultural Resources Survey of 84.3 Acres of Tonto National Forest and Private Lands for the SRP Silver King to Goldfield 230kV Upgrade, North of Superior, Pinal County, Arizona (2008)
DOCUMENT Full-Text David A. Bild.

SRP is planning to upgrade the current carrying capacity of 18.3 miles of the existing Silver King to Goldfield 230kV line. In order to accomplish this, SRP plans to “bundle” the existing 230kV conductors by adding a second conductor to each of the three existing single-conductor phases. To add the new conductors, SRP will need to re-open some original access roads, and the selected wire, puller, sleeving, and anchor sites used during the original 1978 line construction. The existing...