AZ U:3:63 (ASM) (Site Name Keyword)

1-2 (2 Records)

An Archaeological Evaluation of a Proposed Electric Power Line Construction Project on Tonto Creek near El Oso Road and Highway 188, Gila County, Arizona (1983)
DOCUMENT Full-Text Lyle M. Stone.

On December 12, 1983, Lyle M. Stone and Douglas R. Mitchell of Archaeological Research Services, Inc. performed an archaeological survey along the route of a proposed power line construction project on Tonto Creek near the intersection of El Oso Road and Highway 188, Gila County, Arizona. This project, proposed by Salt River Project, will entail: (1) the construction of 755 ft of new underground electric line; (2) the construction of 1200 ft of new overhead line; and (3) the modification of...


An Archaeological Survey of a 2.3 Mile Long Right-of-Way for a Proposed 22 kV Distribution Line on the Tonto National Forest, Tonto Basin District, Gila County, Arizona (1982)
DOCUMENT Full-Text Lyle M. Stone.

On July 28, 1982, Lyle M. Stone of Archaeological Research Services, Inc. performed an archaeological survey of a 2.3 mile by 100 ft wide right-of-way for a proposed 22 kV distribution line on the Tonto National Forest near Punkin Center, Gila Country, Arizona. The proposed Salt River Project distribution line will serve an AT&T relay station in the vicinity of Four Peaks. This survey was requested by Salt River Project in order to determine if important cultural resources (prehistoric or...