AZ U:6:2 (ASU) (Site Name Keyword)
1-4 (4 Records)
On August 27, 1982, Lyle M. Stone and James E. Ayres of Archaeological Research Services, Inc. (ARS) performed an archaeological survey of an approximately 128 acre parcel of land on the south side of the Salt River near Granite Reef Dam. The study area consists of U. S. Department of the Interior, Bureau of Land Management-administered land which has been withdrawn for U. S. Bureau of Reclamation purposes for use by the Salt River Project. Accordingly, this survey was performed under the...
A Class I Inventory of 9.61 Miles for the Thunderstone to Verde 69 kV Rebuild, Maricopa County, Arizona (2001)
On December 15, 2000, Entranco was authorized by Salt River Project (SRP) to conduct a Class I Inventory of an approximately 9.61-mile-long, variable width corridor from the Thunderstone Receiving Station to the Verde Substation in Maricopa County, Arizona. The project area includes Bureau of Indian Affairs right-of-way across the Salt River Pima-Maricopa Indian Community, and land under the jurisdiction of the Bureau of Reclamation, operated and managed by the Central Arizona Project and...
An Evaluation of Historic Cultural Resources in Relation to the Central Arizona Water Control Study (1984)
This is a final, summary report on historic cultural resources in relation to the Central Arizona Water Control Study (CAWCS). The objectives of the CAWCS were to identify and evaluate alternative measures for flood control and regulatory water storage in Central Arizona in conjunction with construction of the Central Arizona Project. Having considered numerous alternative plans to meet these objectives, the Bureau of Reclamation defined a preferred alternative (Plan...
Historic Cultural Resources in Relation to the Central Arizona Water Control Study (1983)
Flooding along the Salt, Gila, Verde, and Agua Fria Rivers in February and March of 1978 resulted in extensive damage to property in Central Arizona and in the disruption of ground transportation and commerce in the greater Phoenix area. Major flooding also occurred along these rivers in December, 1978 and February, 1980. The recognition of this flooding problem, and of requirements for the regulatory storage of Central Arizona Project (CAP) water, prompted the U.S. Department of the Interior,...