AZ M:12:21 (ASM) (Site Name Keyword)

1-3 (3 Records)

An Archaeological Transect Across the Western Prescott Periphery: Prehistoric Site Distribution Based on Combined Survey Results (1996)
DOCUMENT Full-Text Thomas E. Wright. David E. Purcell.

Three archaeological surveys have been conducted along parallel transects through west-central Arizona: the Museum of Northern Arizona's survey of the Mead to Phoenix powerline right-of-way, SWCA's survey of Mead to Phoenix project construction access roads, and Archaeological Research Services's survey of the U. S. Highway 93 right-of-way for the Arizona Department of Transportation. Combining the results of these surveys and previous research reveals three major concentrations of sites. These...


The Mead to Phoenix 500kV Transmission Line Project: An Intensive Archaeological Survey of Construction Access Roads in Clark County, Nevada, and Mohave, Yavapai, and Maricopa Counties, Arizona (1996)
DOCUMENT Full-Text David E. Purcell. Thomas Chadderdon.

The following document presents the results of an intensive archaeological resources survey of construction access roads for the Mead to Phoenix 500kV Transmission Line Project (Mead to Phoenix Project). The survey constituted one phase of cultural resource compliance undertaken for this project by SWCA, Inc., Environmental Consultants (SWCA), for Salt River Project (SRP). Other phases include relocation and re-evaluation (Anduze and Sorrell 1995) of sites previously recorded during survey of...


The Mead to Phoenix 500kV Transmission Line Project: The Results of Construction Monitoring at Archaeological Sites in Clark County, Nevada, and Mohave, Yavapai, and Maricopa Counties, Arizona (1996)
DOCUMENT Full-Text David E. Purcell.

Salt River Project constructed a 500kV transmission line from Boulder City, Nevada, to near Phoenix, Arizona, during which SWCA, Inc., Environmental Consultants, monitored construction at 20 previously recorded archaeological sites. Monitoring took the form of damage assessments at six sites and one non-site location, active monitoring of construction at 15 sites, inspections of site conditions and reflagging at two sites, and examination of possible human remains and monitoring at one location...