AZ U:7:12 (ASM) (Site Name Keyword)
1-3 (3 Records)
The Federal Highway Administration (FHWA) and the Arizona Department of Transportation (ADOT) are planning a spot improvement and pavement preservation project along State Route (SR) 88, also known as the Apache Trail between Milepost (MP) 203.40 and MP 220.20, northeast of the town of Apache Junction, Maricopa County, Arizona. The construction project would involve milling the existing pavement and replacing it with new pavement; stabilizing shoulders, paving existing and new turnouts and...
A Cultural Resources Survey of 17.5 Miles of State Route 88, the Apache Trail, Between Apache Junction and Tortilla Flat, Pinal and Maricopa Counties, Arizona (1995)
Between April 15 and June 14, 1993, Archaeological Research Services, Inc. performed a cultural resources survey of State Route 88 (the Apache Trail). The right-of-way varies from 66 to 200 feet, but construction as-builts were not available. Therefore, the Arizona Department of Transportation requested that a 200 foot wide right-of-way be surveyed for the entire project length unless clearly marked property boundaries or other right-of-way indications were present. The 17.5 mile long survey...
The Eastern Mining Area 115 kV Transmission Line Survey: Archaeological Resources in the Salt-Gila Uplands of Central Arizona (1996)
SWCA Inc, Environmental Consultants of Tucson, Arizona, conducted Eastern Mining Area (EMA) survey project under contract to Salt River Project (SRP) between October 1993 and February 1994. One central purpose of the project was to create an inventory of archaeological resources to assist in the planning of future improvements and other modifications to existing SRP transmission lines. The project included 107 person-field days of Class III archaeological survey along approximately 257 linear...