AZ U:10:3 (ASM) (Site Name Keyword)
1-2 (2 Records)
In 1978, the Bureau of Reclamation (Reclamation) directed the Museum of Northern Arizona (MNA) to complete an intensive archaeological survey of the proposed alignment for the Salt-Gila Aqueduct, a feature of the Central Arizona Project. The survey area was 11,115 acres and included the 60 mile-long transmission line (with a typical width of 200 meters), three proposed utility line locations, one flood retention dike location, 11 possible spoil or realignment areas, and a subsidence well....
A Class I Inventory of 9.61 Miles for the Thunderstone to Verde 69 kV Rebuild, Maricopa County, Arizona (2001)
On December 15, 2000, Entranco was authorized by Salt River Project (SRP) to conduct a Class I Inventory of an approximately 9.61-mile-long, variable width corridor from the Thunderstone Receiving Station to the Verde Substation in Maricopa County, Arizona. The project area includes Bureau of Indian Affairs right-of-way across the Salt River Pima-Maricopa Indian Community, and land under the jurisdiction of the Bureau of Reclamation, operated and managed by the Central Arizona Project and...