AZ U:10:3 (ASM) (Site Name Keyword)

1-2 (2 Records)

Archeological Investigations Along the Salt-Gila Aqueduct (1979)
DOCUMENT Full-Text Pat H. Stein.

In 1978, the Bureau of Reclamation (Reclamation) directed the Museum of Northern Arizona (MNA) to complete an intensive archaeological survey of the proposed alignment for the Salt-Gila Aqueduct, a feature of the Central Arizona Project. The survey area was 11,115 acres and included the 60 mile-long transmission line (with a typical width of 200 meters), three proposed utility line locations, one flood retention dike location, 11 possible spoil or realignment areas, and a subsidence well....


A Class I Inventory of 9.61 Miles for the Thunderstone to Verde 69 kV Rebuild, Maricopa County, Arizona (2001)
DOCUMENT Full-Text Teresa L. Rodrigues. Mary-Ellen Walsh.

On December 15, 2000, Entranco was authorized by Salt River Project (SRP) to conduct a Class I Inventory of an approximately 9.61-mile-long, variable width corridor from the Thunderstone Receiving Station to the Verde Substation in Maricopa County, Arizona. The project area includes Bureau of Indian Affairs right-of-way across the Salt River Pima-Maricopa Indian Community, and land under the jurisdiction of the Bureau of Reclamation, operated and managed by the Central Arizona Project and...