At the request of Brian Kenny of the Maricopa County Department of Transportation (MCDOT). Archaeological Consulting Services., Ltd. conducted an intensive archaeological survey of county and private land along Baseline Road in Phoenix, Maricopa County, Arizona. The survey was performed to provide an inventory of cultural resources that might be impacted by proposed road improvements. The work was conducted under permit 97-16BL issued by the Arizona State Museum (ASM). Seven isolated occurrences...
An Archaeological Testing Plan for Sites and Canal Alignments Along Southern Avenue, Between 55th and 75th Avenues, and Along 75th Avenue, Maricopa County, Arizona (2000)
The City of Phoenix plans to install a 25 million gallons per day (MGD) sewer lift station, gravity sewer, and a water line within the City of Phoenix in Maricopa County, Arizona (Figure 1). The gravity sewer will be constructed along Southern Avenue, between 55th and 75th Avenues. The lines for this facility will be located in a 25 m (82 ft) wide area that will extend, from east to west, roughly down the center of Southern Avenue (Figure 1). This sewer will terminate at a proposed 25 million...
Archaeological Testing Plan for the Eastern Boundary of AZ T:12:90 (ASM) [AZ T:12:55 (ASU)], Phoenix, Maricopa County, Arizona (2003)
This document presents a testing plan for a development located in southwest Phoenix. The testing plan was developed at the request of Beazer Homes who was advised by the City of Phoenix Archaeology Section to have this work done. The project area is located at the eastern boundary of the previously recorded prehistoric Hohokam site of AZ T:12:90 (ASM) [AZ T:12:55 (ASU)]. In addition, a prehistoric canal was mapped to cross the project area in this same area. The City of Phoenix has a 250-ft...
A Cultural Resource Survey Along 75th and Southern Avenues, Maricopa County, Arizona (2000)
The city of Phoenix proposes to install a 25 million gallons per day (MGD) sewer lift station, gravity sewer routes, and a water line in Maricopa County, Arizona. A gravity sewer will be constructed along Southern Avenue. This sewer will terminate at a proposed 25 million gallons per day (MGD) permanent lift station. The lift station discharge will be carried north, by force mains, through the Salt River Crossing. The waterline will be constructed from the lift station. Logan Simpson Design Inc....
Tracks through Time: The Archaeology of the METRO Light Rail Corridor, Volume II: Investigations at Pueblo Grande and La Plaza, and Water Management (2011)
This book presents the results of the archaeological investigations that were conducted along then Light Rail route before and during its construction. As with any project that receives federal funding, METRO was legally required to undertake archaeological investigations along the project corridor; but production of this volume reflects not only METRO's commitment to legal compliance with environmental laws, but also the commitment of the cities of Phoenix, Tempe, and Mesa to preserve and...