NA17,314 (Site Name Keyword)

1-3 (3 Records)

Archaeological Survey of the Mead to Phoenix 500kV Direct Current Transmission Line Preferred Alternative: Volume 2: Final Report, Appendix IV (1986)
DOCUMENT Full-Text Deborah P. Dosh. Donald R. Keller.

Appendix IV of the final report for the Archaeological Survey of the Mead to Phoenix 500kv Direct Current Transmission Line Preferred Alternative, Volume 2. This document contains topographic maps of site locations in order of NA site number.


Cultural Resource Analysis of the Changes to the Proposed Mead-Phoenix Transmission Project (1990)
DOCUMENT Full-Text A.E. Rogge. Patrick M. O'Brien.

The Western Area Power Administration (Western), Salt River Project (SRP), Southern California Public Power Authority (SCPPA), and M-S-R Public Power Agency (Modesto- Santa Clara-Redding) (collectively referred to as the project sponsors) propose to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC). This transmission line will connect the Westwing ...


The Mead to Phoenix 500kV Transmission Line Project: Cultural Resource Site Relocation and Evaluation (1995)
DOCUMENT Full-Text Richard Anduze. Danny Sorrell.

Salt River Project is constructing a 500kV transmission line along a 250-mile right-of-way from the Marketplace Substation to the Mead Substation, both near Boulder City, Nevada, to the Westwing Substation northwest of Phoenix, Arizona, near Sun City. The right-of-way is adjacent to and parallels the existing Mead to Liberty 345kV Transmission Line for most of the project area. A 200-foot right-of-way was previously surveyed by the Museum of Northern Arizona (Keller 1986). The present project...