NA17,313 (Site Name Keyword)

1-2 (2 Records)

Archaeological Survey of the Mead to Phoenix 500kV Direct Current Transmission Line Preferred Alternative: Volume 2: Final Report, Appendix IV (1986)
DOCUMENT Full-Text Deborah P. Dosh. Donald R. Keller.

Appendix IV of the final report for the Archaeological Survey of the Mead to Phoenix 500kv Direct Current Transmission Line Preferred Alternative, Volume 2. This document contains topographic maps of site locations in order of NA site number.


Cultural Resource Analysis of the Changes to the Proposed Mead-Phoenix Transmission Project (1990)
DOCUMENT Full-Text A.E. Rogge. Patrick M. O'Brien.

The Western Area Power Administration (Western), Salt River Project (SRP), Southern California Public Power Authority (SCPPA), and M-S-R Public Power Agency (Modesto- Santa Clara-Redding) (collectively referred to as the project sponsors) propose to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC). This transmission line will connect the Westwing ...