NA18,138 (Site Name Keyword)
1-5 (5 Records)
Appendix IV of the final report for the Archaeological Survey of the Mead to Phoenix 500kv Direct Current Transmission Line Preferred Alternative, Volume 2. This document contains topographic maps of site locations in order of NA site number.
Archaeological Survey of the Mead to Phoenix 500kV Direct Current Transmission Line, Preferred Alternative, Volume I, Final Report (1986)
The 243-mile preferred alignment of the proposed Mead to Phoenix ±500kV direct current transmission system was surveyed for archaeological resources by the Museum of Northern Arizona in the spring of 1984. Fifty-eight archaeological sites were identified on the alignment, plus 10 historic routes in areas crossed by the alignment. Seventeen of the sites are historic, dating from the 1860s to World War II. Forty-one prehistoric sites range in age from the late Archaic through the Ceramic period to...
Cultural Resource Analysis of the Changes to the Proposed Mead-Phoenix Transmission Project (1990)
The Western Area Power Administration (Western), Salt River Project (SRP), Southern California Public Power Authority (SCPPA), and M-S-R Public Power Agency (Modesto- Santa Clara-Redding) (collectively referred to as the project sponsors) propose to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC). This transmission line will connect the Westwing ...
The Mead to Phoenix 500kV Transmission Line Project: Cultural Resource Site Relocation and Evaluation (1995)
Salt River Project is constructing a 500kV transmission line along a 250-mile right-of-way from the Marketplace Substation to the Mead Substation, both near Boulder City, Nevada, to the Westwing Substation northwest of Phoenix, Arizona, near Sun City. The right-of-way is adjacent to and parallels the existing Mead to Liberty 345kV Transmission Line for most of the project area. A 200-foot right-of-way was previously surveyed by the Museum of Northern Arizona (Keller 1986). The present project...
The Mead to Phoenix 500kV Transmission Line Project: The Results of Construction Monitoring at Archaeological Sites in Clark County, Nevada, and Mohave, Yavapai, and Maricopa Counties, Arizona (1996)
Salt River Project constructed a 500kV transmission line from Boulder City, Nevada, to near Phoenix, Arizona, during which SWCA, Inc., Environmental Consultants, monitored construction at 20 previously recorded archaeological sites. Monitoring took the form of damage assessments at six sites and one non-site location, active monitoring of construction at 15 sites, inspections of site conditions and reflagging at two sites, and examination of possible human remains and monitoring at one location...