NA18,131 (Site Name Keyword)

1-3 (3 Records)

Archaeological Survey of the Mead to Phoenix 500kV Direct Current Transmission Line, Preferred Alternative, Volume I, Final Report (1986)
DOCUMENT Full-Text Donald R. Keller.

The 243-mile preferred alignment of the proposed Mead to Phoenix ±500kV direct current transmission system was surveyed for archaeological resources by the Museum of Northern Arizona in the spring of 1984. Fifty-eight archaeological sites were identified on the alignment, plus 10 historic routes in areas crossed by the alignment. Seventeen of the sites are historic, dating from the 1860s to World War II. Forty-one prehistoric sites range in age from the late Archaic through the Ceramic period to...


Cultural Resource Analysis of the Changes to the Proposed Mead-Phoenix Transmission Project (1990)
DOCUMENT Full-Text A.E. Rogge. Patrick M. O'Brien.

The Western Area Power Administration (Western), Salt River Project (SRP), Southern California Public Power Authority (SCPPA), and M-S-R Public Power Agency (Modesto- Santa Clara-Redding) (collectively referred to as the project sponsors) propose to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC). This transmission line will connect the Westwing ...


The Mead to Phoenix 500kV Transmission Line Project: Cultural Resource Site Relocation and Evaluation (1995)
DOCUMENT Full-Text Richard Anduze. Danny Sorrell.

Salt River Project is constructing a 500kV transmission line along a 250-mile right-of-way from the Marketplace Substation to the Mead Substation, both near Boulder City, Nevada, to the Westwing Substation northwest of Phoenix, Arizona, near Sun City. The right-of-way is adjacent to and parallels the existing Mead to Liberty 345kV Transmission Line for most of the project area. A 200-foot right-of-way was previously surveyed by the Museum of Northern Arizona (Keller 1986). The present project...