Whip It Site (Site Name Keyword)

1-4 (4 Records)

A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
PROJECT David Doyel. USDI Bureau of Reclamation, Phoenix Area Office.

The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...


A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
DOCUMENT Full-Text David Doyel. Joseph Crary. Gina Gage. Karolyn Jackman Jensen.

The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...


Hohokam Settlement Along the Slopes of the Picacho Mountains, Volume 5: Environment and Subsistence (1988)
DOCUMENT Full-Text Uploaded by: Lauren Jelinek

This is the fifth volume in a six volume series presenting the results of archaeological studies at Hohokam sites along the Tucson Aqueduct.The volume focuses on pollen, flotation and faunal studies in an effort to understand the paleonenvironment of the study area during the periods the sites were occupied and the subsistence strategies of the sites' occupants. Primary site-specific emphasis is on determining feature functions as they relate to biological results. The studies presented document...


Tucson Aqueduct Project Phase A
PROJECT Donald E. Weaver, Jr.. Donald E. Weaver, Jr.. USDI Bureau of Reclamation, Phoenix Area Office.

Reaches 1 and 2 of the Tucson Aqueduct portion of the Central Arizona Project extend from the terminus of the Salt-Gila Aqueduct just east of Picacho Reservoir (12 km southeast of Coolidge) south along the western flanks of the Picacho Mountains, east along the southern flanks of the Picacho Mountains through Picacho Pass, and then south to the vicinity of Red Rock. A Class III archaeological survey of the aqueduct corridor and associated areas was conducted by Arizona State Museum...