AZ T:3:11 (ARS) (Site Name Keyword)

1-3 (3 Records)

An Evaluation of Historic Cultural Resources in Relation to the Central Arizona Water Control Study (1984)
DOCUMENT Full-Text Lyle M. Stone. James E. Ayres.

This is a final, summary report on historic cultural resources in relation to the Central Arizona Water Control Study (CAWCS). The objectives of the CAWCS were to identify and evaluate alternative measures for flood control and regulatory water storage in Central Arizona in conjunction with construction of the Central Arizona Project. Having considered numerous alternative plans to meet these objectives, the Bureau of Reclamation defined a preferred alternative (Plan...


Final Report for Plan 6 Supplemental Cultural Resource Surveys (1985)
DOCUMENT Full-Text Margerie Green. R. W. Effland, Jr.. J. H. King.

This final report reflects a year of on-call Class III cultural resource surveys for Plan 6, the Regulatory Storage Division of the Central Arizona Project. Included are eight reports representing close to 6000 acres of survey performed in the vicinity of the planned New Waddell Dam by Archaeological Consulting Services for the Arizona Projects Office, U.S. Bureau of Reclamation. Because New Waddell Dam is designed to be rock filled, one of the focal points of the contract was to survey proposed...


Historic Cultural Resources in Relation to the Central Arizona Water Control Study (1983)
DOCUMENT Full-Text Lyle M. Stone. James E. Ayres.

Flooding along the Salt, Gila, Verde, and Agua Fria Rivers in February and March of 1978 resulted in extensive damage to property in Central Arizona and in the disruption of ground transportation and commerce in the greater Phoenix area. Major flooding also occurred along these rivers in December, 1978 and February, 1980. The recognition of this flooding problem, and of requirements for the regulatory storage of Central Arizona Project (CAP) water, prompted the U.S. Department of the Interior,...