Beardsley Canal (Site Name Keyword)

1-10 (10 Records)

Agua Fria Energy Storage Project in Peoria, Arizona
PROJECT Andrew Vorsanger. AES Clean Energy.

AES proposes to develop the Agua Fria Energy Storage Project adjacent to the Arizona Public Service Company’s Raceway Substation in the City of Peoria, Maricopa County, Arizona. The proposed battery storage facility will be located on private land north of the Raceway Substation, with use of an existing access road within Bureau of Reclamation (BOR) administered land for the Central Arizona Project (CAP), located southeast of the substation. No specific project design for the battery storage...


Cultural Resources Inventory for the Agua Fria Energy Storage Project in Peoria, Maricopa County, Arizona (2022)
DOCUMENT Full-Text Andrew Vorsanger. Chris Whiting. Caitlin Hayden.

AES proposes to develop the Agua Fria Energy Storage Project adjacent to the Arizona Public Service Company’s Raceway Substation in the City of Peoria, Maricopa County, Arizona. The proposed battery storage facility will be located on private land north of the Raceway Substation, with use of an existing access road within Bureau of Reclamation (BOR) administered land for the Central Arizona Project (CAP), located southeast of the substation. No specific project design for the battery storage...


Final Report for Plan 6 Supplemental Cultural Resource Surveys (1985)
DOCUMENT Full-Text Margerie Green. R. W. Effland, Jr.. J. H. King.

This final report reflects a year of on-call Class III cultural resource surveys for Plan 6, the Regulatory Storage Division of the Central Arizona Project. Included are eight reports representing close to 6000 acres of survey performed in the vicinity of the planned New Waddell Dam by Archaeological Consulting Services for the Arizona Projects Office, U.S. Bureau of Reclamation. Because New Waddell Dam is designed to be rock filled, one of the focal points of the contract was to survey proposed...


Historic Cultural Resources in Relation to the Central Arizona Water Control Study (1983)
DOCUMENT Full-Text Lyle M. Stone. James E. Ayres.

Flooding along the Salt, Gila, Verde, and Agua Fria Rivers in February and March of 1978 resulted in extensive damage to property in Central Arizona and in the disruption of ground transportation and commerce in the greater Phoenix area. Major flooding also occurred along these rivers in December, 1978 and February, 1980. The recognition of this flooding problem, and of requirements for the regulatory storage of Central Arizona Project (CAP) water, prompted the U.S. Department of the Interior,...


The Historical Archaeology of Dam Construction Camps in Central Arizona
PROJECT Cindy L. Myers. A. E. Rogge. USDI Bureau of Reclamation, Phoenix Area Office.

In June 1986, the Bureau of Reclamation awarded a three-year contract for historical archaeological studies as part of the mitigation program for the Central Arizona Project's Regulatory Storage Division, designated as Plan 6. These studies involved investigations at approximately 50 archaeological sites in 7 localities. The sites were destroyed, damaged, or altered as a result of constructing Plan 6, which created a regulatory reservoir for the CAP as well as repaired or replaced other dams...


The Historical Archaeology of Dam Construction Camps in Central Arizona, Volume 1: Synthesis (1994)
DOCUMENT Full-Text Uploaded by: Lauren Jelinek

In June 1986, the Bureau of Reclamation awarded Dames & Moore a contract for historical archaeological studies as part of the mitigation program for the Central Arizona Project's Regulatory Storage Division, designated as Plan 6. This study focused on reconstructing the social history of the workers and their families who lived in several temporary dam construction camps dating from the 1890s through the 1940s. This document, the first in a series of three volumes that constitute the final...


The Historical Archaeology of Dam Construction Camps in Central Arizona, Volume 3: Laboratory Methods and Data Computerization (1989)
DOCUMENT Full-Text Deborah A. Hull-Walski. James E. Ayres.

In June 1986 the Bureau of Reclamation awarded Dames & Moore a contract for historical archaeological studies as part of the mitigation program for the Regulatory Storage Division (Plan 6) of the Central Arizona Project. This study focused on reconstructing the social history of the workers and their families who lived in several temporary dam construction camps dating from the 1890s to the 1940s. This is the third (of three) volumes of the final technical report. This volume summarizes the...


Intensive Cultural Resource Survey of Lake Pleasant Regional Park, Maricopa and Yavapai Counties, Arizona
PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

In the summers of 1979 and 1980, Arizona State University (ASU) conducted a cultural resources survey of Lake Pleasant Regional Park (LPRP) (Rice and Bostwick 1986). The completion of New Waddell Dam in 1993, increasing recreational development, and new park boundaries spurred the Bureau of Reclamation (Reclamation) to survey the park. Reclamation performed the new survey on their land to fulfill their Section 110 requirements of the National Historic Preservation Act. Upon completion of the...


Intensive Cultural Resource Survey of Lake Pleasant Regional Park, Maricopa and Yavapai Counties, Arizona (2002)
DOCUMENT Full-Text Jerryll Moreno.

In the summers of 1979 and 1980, Arizona State University (ASU) conducted a cultural resources survey of Lake Pleasant Regional Park (LPRP) (Rice and Bostwick 1986). The completion of New Waddell Dam in 1993, increasing recreational development, and new park boundaries spurred the Bureau of Reclamation (Reclamation) to survey the park. Reclamation performed the new survey on their land to fulfill their Section 110 requirements of the National Historic Preservation Act. Upon completion of the...


Lake Pleasant Section 110 Condition Assessment and Evaluation of NRHP Eligibility for the Bureau of Reclamation in Maricopa and Yavapai Counties, Arizona (2022)
DOCUMENT Full-Text Galen McCloskey. Chance Copperstone. Barbara Montgomery.

In compliance with Section 110 of the National Historic Preservation Act (54 U.S.C. 306102), the Bureau of Reclamation, Phoenix Area Office (Reclamation) contracted with Tierra Right of Way Services to relocate, re-evaluate, and re-record previously identified cultural resources situated on Reclamation-managed lands near Lake Pleasant, in Maricopa and Yavapai Counties, Arizona. Between November 2, 2020 and March 18, 2022, Tierra Right of Way archaeologists conducted several field sessions to...