AZ U:6:266 (ASM) (Site Name Keyword)
1-6 (6 Records)
The following report presents the results of a 16-mile survey of the Verde Circuit 12kV distribution lines between Stewart Mountain and Granite Reef Dams, conducted by Statistical Research, Inc. (SRI), for the Salt River Project (SRP). Following the collection of permits and a systematic check of all records pertaining to archaeological resources in the proposed area of study, field investigation of the distribution lines was conducted from October 8 to 11, 1997. Field investigation of the...
An Archaeological Survey of the Salt River Project Verde Circuit 12kV Distribution Line from Saguaro Lake to Granite Reef Dam, Maricopa County, Arizona, Draft Report (1998)
The following report presents the results of a 16-mile survey of the Verde Circuit 12kV distribution lines between Stewart Mountain and Granite Reef Dams, conducted by Statistical Research, Inc. (SRI), for the Salt River Project (SRP). Following the collection of permits and a systematic check of all records pertaining to archaeological resources in the proposed area of study, field investigation of the distribution lines was conducted from October 8 to 11, 1997. Field investigation of the...
A Class I Inventory of 9.61 Miles for the Thunderstone to Verde 69 kV Rebuild, Maricopa County, Arizona (2001)
On December 15, 2000, Entranco was authorized by Salt River Project (SRP) to conduct a Class I Inventory of an approximately 9.61-mile-long, variable width corridor from the Thunderstone Receiving Station to the Verde Substation in Maricopa County, Arizona. The project area includes Bureau of Indian Affairs right-of-way across the Salt River Pima-Maricopa Indian Community, and land under the jurisdiction of the Bureau of Reclamation, operated and managed by the Central Arizona Project and...
A Cultural Resource Survey of Approximately 5.2 Miles of Right-of-Way and 10 Associated Wire Pulling Stations for the SRP 69 kV Subtransmission Line Reconductoring Project Near Fountain Hills, Maricopa County, Arizona (2002)
This report presents the results of a Class III non-collection cultural resource survey of approximately 5.2 miles (mi.) of existing SRP right-of-way and 10 associated wire pulling stations for the SRP 69 kV subtransmission line reconductoring project near Fountain Hills, Maricopa County, Arizona. The survey was conducted by Entranco at the request of SRP prior to the replacement of existing power poles and power transmission line within the Fort McDowell Yavapai Nation (FMYN) and the Salt River...
SRP 69 kV Subtransmission Line Reconductoring Project, Draft Environmental Assessment (2002)
This Environmental Assessment (EA) has been prepared to evaluate Salt River Project (SRP) proposed plans to perform major maintenance to two 69 kilovolt (kV) subtransmission lines within an SRP power line utility corridor easement. Although this project is not a Federal undertaking or action, this EA has been prepared in accordance with the guidelines contained in the Bureau of Indian Affairs (BIA) Manual Release No. 9303, NEPA Handbook, September 24, 1993. The manual provides guidance for...
SRP 69 kV Subtransmission Line Reconductoring Project, Final Environmental Assessment (2002)
This Environmental Assessment (EA) has been prepared at the request of the Salt River Pima Maricopa Indian Community (SRPMIC) to evaluate Salt River Project (SRP) proposed plans to perform major maintenance to two 69 kilovolt (kV) subtransmission lines within an SRP power line utility corridor easement. Although this project is not a Federal undertaking or action, this EA has been prepared in accordance with the guidelines contained in the Bureau of Indian Affairs (BIA) Manual Release No. 9303,...