SRP 69 kV Subtransmission Line Reconductoring Project, Final Environmental Assessment

Summary

This Environmental Assessment (EA) has been prepared at the request of the Salt River Pima Maricopa Indian Community (SRPMIC) to evaluate Salt River Project (SRP) proposed plans to perform major maintenance to two 69 kilovolt (kV) subtransmission lines within an SRP power line utility corridor easement. Although this project is not a Federal undertaking or action, this EA has been prepared in accordance with the guidelines contained in the Bureau of Indian Affairs (BIA) Manual Release No. 9303, NEPA Handbook, September 24, 1993. The manual provides guidance for complying with the National Environmental Policy Act (NEPA) and its implementing regulations, [Title 40 of the Code of Federal Regulations (40 CFR) Parts 1500-1508].

The purpose of this EA is to evaluate the potential social, economic and environmental impacts that may occur from the project and to identify measures that will effectively mitigate potential adverse impacts. The goal of this document is to assist decision-makers in making informed decisions about the project.

Cite this Record

SRP 69 kV Subtransmission Line Reconductoring Project, Final Environmental Assessment. Environmental Services Group, ENTRANCO, Inc.. 2002 ( tDAR id: 428102) ; doi:10.6067/XCV8428102

This Resource is Part of the Following Collections

Spatial Coverage

min long: -111.909; min lat: 33.478 ; max long: -111.665; max lat: 33.582 ;

File Information

  Name Size Creation Date Date Uploaded Access
2002_Entranco_SRP69kVLine_OCR_PDFA.pdf 21.99mb Apr 30, 2002 Apr 17, 2017 4:34:55 PM Confidential
This file is unredacted.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Salt River Project Cultural Resource Manager