AZ T:9:24 (MNA) (Site Name Keyword)
1-2 (2 Records)
The proposed project consists of approximately 37 miles of 500 kilovolt (kV) transmission line to interconnect electric generation resources in the west valley with the existing 230kV system in the metropolitan Phoenix area. Also, the proposed 500kV transmission line will be double circuited with a 230kV transmission line for approximately 10 miles. The double circuit 500/230kV transmission line will extend between the proposed Southwest Valley Substation to the existing Liberty ...
Draft: Treatment and Work Plan for Archaeological Investigations and Monitoring at Eight Sites Along the Southwest Valley 500 kV Transmission Line Project, Maricopa County, Arizona (2002)
APS and SRP were issued a Certificate of Environmental Compatibility (CEC) by the Arizona Corporation Commission for their Southwest Valley 500kV Transmission Line Project (Southwest Valley Project). The project consists of approximately 37 miles of 500 kilovolt (kV) transmission line to interconnect electric generation resources in the west valley with the existing 230kV system in the metropolitan Phoenix area.