This document presents the results of archaeological testing prior to a proposed residential development in Goodyear, Arizona. The project proponent, Sonterra Partners, is planning to develop approximately 800 acres of private land in Goodyear, Arizona for single-family housing. Numerous surface artifacts were identified within the documented boundary of two previously identified large prehistoric Hohokam sites—Alkali Ruin (AZ T:11:24 [ASM]) and the Morocco Ruin (AZ T:11:106 [ASM]) (North...
Archaeology at Alkali Ruin (2003)
Arizona Public Service (APS) and Salt River Project (SRP) were issued a Certificate of Environmental Compatibility (CEC) by the Arizona Corporation Commission (ACC) for the construction of the Southwest Valley 500kV Transmission Line Project (Southwest Valley Project). The project consists of 37 miles of 500 kilovolt (kV) transmission line to interconnect electric generation resources in the west valley with the existing 230kV system in the metropolitan Phoenix area. The project is located in...
A Cultural Resource Survey for the Proposed Southwest Valley 500kV Transmission Line Project, Maricopa County, Arizona (2002)
The proposed project consists of approximately 37 miles of 500 kilovolt (kV) transmission line to interconnect electric generation resources in the west valley with the existing 230kV system in the metropolitan Phoenix area. Also, the proposed 500kV transmission line will be double circuited with a 230kV transmission line for approximately 10 miles. The double circuit 500/230kV transmission line will extend between the proposed Southwest Valley Substation to the existing Liberty ...
Draft: Treatment and Work Plan for Archaeological Investigations and Monitoring at Eight Sites Along the Southwest Valley 500 kV Transmission Line Project, Maricopa County, Arizona (2002)
APS and SRP were issued a Certificate of Environmental Compatibility (CEC) by the Arizona Corporation Commission for their Southwest Valley 500kV Transmission Line Project (Southwest Valley Project). The project consists of approximately 37 miles of 500 kilovolt (kV) transmission line to interconnect electric generation resources in the west valley with the existing 230kV system in the metropolitan Phoenix area.