Cultural Resource Analysis of the Changes to the Proposed Mead-Phoenix Transmission Project (1990)
DOCUMENT Full-Text A.E. Rogge. Patrick M. O'Brien.

The Western Area Power Administration (Western), Salt River Project (SRP), Southern California Public Power Authority (SCPPA), and M-S-R Public Power Agency (Modesto- Santa Clara-Redding) (collectively referred to as the project sponsors) propose to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC). This transmission line will connect the Westwing ...


The Mead to Phoenix 500kV Transmission Line Project: An Intensive Archaeological Survey of Construction Access Roads in Clark County, Nevada, and Mohave, Yavapai, and Maricopa Counties, Arizona (1996)
DOCUMENT Full-Text David E. Purcell. Thomas Chadderdon.

The following document presents the results of an intensive archaeological resources survey of construction access roads for the Mead to Phoenix 500kV Transmission Line Project (Mead to Phoenix Project). The survey constituted one phase of cultural resource compliance undertaken for this project by SWCA, Inc., Environmental Consultants (SWCA), for Salt River Project (SRP). Other phases include relocation and re-evaluation (Anduze and Sorrell 1995) of sites previously recorded during survey of...