26CK3411 (Site Name Keyword)
1-1 (1 Record)
Cultural Resource Analysis of the Changes to the Proposed Mead-Phoenix Transmission Project (1990)
DOCUMENT
Full-Text
The Western Area Power Administration (Western), Salt River Project (SRP), Southern California Public Power Authority (SCPPA), and M-S-R Public Power Agency (Modesto- Santa Clara-Redding) (collectively referred to as the project sponsors) propose to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC). This transmission line will connect the Westwing ...