AZ U:15:240 (ASM) (Site Name Keyword)
1-4 (4 Records)
This document presents the results of a class I cultural resources inventory and the results of the relocation and evaluation efforts for 14 previously recorded cultural resource sites located within the proposed Merrill Ranch residential community near Florence, Pinal County, Arizona (Figure 1). Vanguard Properties requested that Carter & Burgess, Inc. (C&B) conduct the inventory and relocation as part of the application process to obtain a permit from the United States Army Corp of Engineers...
A Class I Cultural Resources Inventory of the North-South Corridor Study, Pinal County, Arizona (2011)
Under contract with the Arizona Department of Transportation (ADOT), HDR Engineering, Inc. (HDR), has been tasked with the preliminary planning and predesign of a north-south highway corridor in Pinal County, Arizona (Federal Highway Administration Project No. STP-999-A [BBM]; TRACS No. 999 PN H7454 O1L). This highway will link Interstate 10 (I-10), in the vicinity of Picacho, to U.S. Highway 60 (also known as the Superstition Freeway), in the vicinity of Apache Junction. HDR has subcontracted...
The Eastern Mining Area 115 KV Transmission Line Survey: Archaeological Resources in the Salt-Gila Uplands of Central Arizona (1996)
SWCA, Inc., Environmental Consultants (SWCA), of Tucson, Arizona, conducted the Eastern Mining Area (EMA) survey project under contract to Salt River Project (SRP) between October, 1993, and February, 1994. One central purpose of the project was to create an inventory of archaeological resources to assist in the planning of future improvements and other modifications to existing SRP transmission lines. The project included 107 person-field days of Class III archaeological survey along...
The Eastern Mining Area 115 kV Transmission Line Survey: Archaeological Resources in the Salt-Gila Uplands of Central Arizona (1996)
SWCA Inc, Environmental Consultants of Tucson, Arizona, conducted Eastern Mining Area (EMA) survey project under contract to Salt River Project (SRP) between October 1993 and February 1994. One central purpose of the project was to create an inventory of archaeological resources to assist in the planning of future improvements and other modifications to existing SRP transmission lines. The project included 107 person-field days of Class III archaeological survey along approximately 257 linear...