Cultural Resources Survey for the SRP Palo Verde to Pinal West 500 kV Transmission Lines, Maricopa and Pinal Counties, Arizona (2007)
DOCUMENT Full-Text Tiffany C. Clark. T. Kathleen Henderson.

This report presents the results of Class III cultural resources surveys conducted for the Palo Verde to Pinal West Transmission Line Project. The work was sponsored by Salt River Project (SRP) in support of two proposed 500 kV transmission lines that will connect the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona. The cultural resources studies described here include three previous archaeological...


The El Paso Natural Gas Line No. 2000 Conversion Project: An Archaeological Re-Survey of the Former All American Pipeline Across La Paz, Yuma, Maricopa, Pinal, Pima, and Cochise Counties, Arizona (2000)
DOCUMENT Full-Text Chris D. North.

In April and May 2000, SWCA, Inc., Environmental Consultants (SWCA) conducted cultural resource surveys for EPNG's Line No. 2000 Project, surveying the former All American Pipeline in Cochise, La Paz, Maricopa, Pima, and Pinal counties for the Arizona segment. At the request of EPNG, SWCA began the cultural resources survey for this project in April 2000 in support of an Environmental Assessment (EA) being prepared by ENSR, Inc., in conjunction with a pipeline acquisition, conversion, operation...


Treatment and Data Recovery Plan for the SRP Palo Verde to Pinal West 500 kV Transmission Line, Maricopa and Pinal Counties, Arizona (2007)
DOCUMENT Full-Text T. Kathleen Henderson.

Salt River Project Agricultural  Improvement and  Power District  (SRP)  plans  to construct a new  500  kV  transmission  line  between  the  existing  Hassayampa  Switchyard,  west  of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line,  this  powerline  is  the  first  of two  that SRP  plans  to  eventually  construct between  the Hassayampa  Switchyard  and...