This report presents the results of a Class III cultural resources survey of Arizona State Land right-of-way easements for a new extra-high voltage transmission line to be built between the Santa Rosa Substation, located south of the Ak Chin Indian Community, and the Dinosaur Substation, located east of the Town of Queen Creek, in Pinal County, Arizona (Figure 1). The proposed transmission line is part of the larger Pinal West to Abel/Browning (PW-ABL/BRG) 500 kV Transmission Line Project. The...
Cultural Resources Survey for the Pinal West to Dinosaur Extra-High Voltage Transmission Line, Pinal County, Arizona (2009)
Class III cultural resources survey for an extra-high voltage transmission line connecting the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur Substations in Pinal County, Arizona.
Cultural Resources Survey for the SRP Dinosaur-to-Hunt Substations 12kV/69kV Electric Lines, Pinal County, Arizona (2007)
Class III cultural resources survey for 12kV/69kV electric lines connecting the Dinosaur Substation and the Hunt Substation southeast of Queen Creek, Pinal County, Arizona.
Data Recovery Plan for Archaeological Sites on Arizona State Trust Land along the SRP Pinal West to Dinosaur Extra-High Voltage Transmission Line, Pinal County, Arizona (2009)
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct an 88-mile-long extra-high voltage transmission line linking the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur Substations. The project corridor traverses the area from the Maricopa/Pinal County line west of the Ak Chin Indian Community, southeastward and eastward past Casa Grande, Arizona, then roughly northward past Coolidge and Florence, Arizona, ending east of Queen Creek, Arizona, along the...
Data Recovery Plan for the SRP Dinosaur-to-Hunt Substations 12kV/69kV Electric Lines, Pinal County, Arizona (2007)
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct new 12kV /69kV electric lines between the Dinosaur and Hunt substations east of Queen Creek, Arizona. A cultural resources survey has determined that portions of nine archaeological sites which meet criteria for inclusion on the Arizona and National Register of Historic Places are present within the electric lines corridor (Clark 2007). SRP has further established that construction activity for the...
The Dinosaur: Archaeological Investigations Within the Gila River Valley for the Salt River Project's Pinal Central to Dinosaur 500 kV Transmission Line, Pinal County, Arizona (2010)
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct an 88-mile-long 500-kV extra-high voltage transmission line linking the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur substations (ACC CEC Case No. 126). This report presents the results of Phase I data recovery (extent testing) and Phase II data recovery within a 40-m- (130-ft-) wide corridor at seven sites located on State Trust Land administered by the Arizona State Land Department (ASLD) (ASLD...