AZ U:15:388 (ASM) (Site Name Keyword)

1-5 (5 Records)

A Class I Cultural Resources Inventory of the North-South Corridor Study, Pinal County, Arizona (2011)
DOCUMENT Full-Text Uploaded by: Sulgi Lotze

Under contract with the Arizona Department of Transportation (ADOT), HDR Engineering, Inc. (HDR), has been tasked with the preliminary planning and predesign of a north-south highway corridor in Pinal County, Arizona (Federal Highway Administration Project No. STP-999-A [BBM]; TRACS No. 999 PN H7454 O1L). This highway will link Interstate 10 (I-10), in the vicinity of Picacho, to U.S. Highway 60 (also known as the Superstition Freeway), in the vicinity of Apache Junction. HDR has subcontracted...


Cultural Resources Survey for the Pinal West to Dinosaur Extra-High Voltage Transmission Line, Pinal County, Arizona (2009)
DOCUMENT Full-Text T. Kathleen Henderson. Michael W. Lindeman. Tiffany C. Clark.

Class III cultural resources survey for an extra-high voltage transmission line connecting the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur Substations in Pinal County, Arizona.


A Cultural Resources Survey of 33.80 Acres for a Salt River Project 69kV Transmission Line Along Quail Run Road and Judd Road, Pinal County, Arizona (2008)
DOCUMENT Full-Text Jackie L. Orcholl.

Salt River Project (SRP) requested that Logan Simpson Design Inc. (LSD) perform a Class III cultural resources survey of the approximately 4.25-mile by 20-m-wide corridor to identify and evaluate any cultural resources that could be affected by the construction of a new 69kV transmission line from the existing Quail Substation to the proposed Shipley Substation between Quail Run Road and Cooper Road in Magma, Pinal County. The survey area measures 22,440 ft long by 65.62 ft wide and encompasses...


A Cultural Resources Survey of 351 Acres Within a 513-Acre Parcel for the Proposed Salt River Project Abel Generation Peaking Plant Site near Quail Run Lane and Bella Vista Road, Queen Creek, Pinal County, Arizona (2009)
DOCUMENT Full-Text Beth Hyman.

Salt River Project Agricultural Improvement and Power District (SRP) requested that Logan Simpson Design Inc. (LSD) perform a Class III cultural resources survey of the proposed Abel Generation Peaking Plant Site. The project area is a combination of recently plowed, planted, and fallow agricultural fields located near Queen Creek, Pinal County, Arizona. The project area encompasses 513 acres of private land adjacent to the intersection of Quail Run Lane and Bella Vista Road and includes a...


Draft Class I Cultural Resources Overview - Abel-Moody 230kV Transmission Project, Maricopa and Pinal Counties, Arizona (2008)
DOCUMENT Full-Text Heather Duncan.

Salt River Project (SRP) plans to construct a double-circuit, 230-kilovolt (kV) transmission line and a new substation, known as RS-24, to reinforce the local, existing electric transmission system by providing an alternate 230kV transmission loop between the new Abel Substation and Moody Substation, which will substantially improve system reliability and performance. The new transmission line is expected to be approximately 20 miles in length, depending on the selected alternative. The...