AZ T:10:84(ASM)/Southern Pacific Phoenix Mainline (Site Name Keyword)

1-1 (1 Record)

A Cultural Resource Survey for Proposed Water Pipelines and Evaporation Ponds for the Desert Basin Power Plant, Casa Grande, Pinal County, Arizona (2000)
DOCUMENT Full-Text A.E. (Gene) Rogge.. Rachel Davies. Carmen Costner. Cara Lonardo. Sharon K. Bauer.

Reliant Energy, Inc. plans to install water supply and discharge facilities to serve the Desert Basin Power Plant now under construction in Casa Grande, Arizona. A buried water supply pipeline, approximately 9 miles long, would be used to convey Central Arizona Project water to the power plant from the East Main Canal of the Maricopa-Stanfield Irrigation District. A buried water discharge pipeline, about 3.5 miles long, would be used to transport wastewater from the cooling towers at the power...