AZ T:12:45(ASM) (Site Name Keyword)
1-3 (3 Records)
Central and Fillmore Associates, LP oversaw improvements to the Westward Ho building and infrastructure. Rehabilitation required replacement and realignment of sewer pipelines below the property courtyard and the replacement of sidewalks in the courtyard. A total of 170.9 cubic meters were excavated from 32 units associated with rehabilitation activities in the courtyard area of the Westward Ho Hotel and Apartments. All of the units were excavated to locate and expose existing underground...
Tracks through Time: Urban Archaeology along the METRO Light Rail Corridor, Volume I: Introduction, Background, and Preliminary Field Studies (2011)
This book presents the results of the archaeological investigations that were conducted along then Light Rail route before and during its construction. As with any project that receives federal funding, METRO was legally required to undertake archaeological investigations along the project corridor; but production of this volume reflects not only METRO's commitment to legal compliance with environmental laws, but also the commitment of the cities of Phoenix, Tempe, and Mesa to preserve and...
Tracks through Time: Urban Archaeology along the METRO Light Rail Corridor, Volume IV, Part 1: Technical Analyses and Material Culture (2011)
This book presents the results of the archaeological investigations that were conducted along then Light Rail route before and during its construction. As with any project that receives federal funding, METRO was legally required to undertake archaeological investigations along the project corridor; but production of this volume reflects not only METRO's commitment to legal compliance with environmental laws, but also the commitment of the cities of Phoenix, Tempe, and Mesa to preserve and...