Resource Processing Site (Site Type Keyword)

1-3 (3 Records)

Archaeological Survey of Red Mountain Freeway (State Route 202) From State Route 87 to US Highway 60, Mesa, Maricopa County, Arizona (1997)
DOCUMENT Full-Text Barbara S. Macnider. Holly DeMaagd. David E. Doyel. Shereen Lerner. Jerryll Moreno.

In conjunction with an Environmental Impact Statement analysis being conducted for the Arizona Department of Transportation (ADOT) Red Mountain Freeway east of State Route (SR) 87 by Entranco Engineers, Inc., Archaeological Consulting Services, Ltd. (ACS) performed cultural resource investigations of proposed alternative alignments. To assist the initial alternative selection process, a Class I survey, or literature review, was first prepared for a 55-square-mile area. A Class III survey of all...


The Bartlett Dam Project: Archaeological Test Excavations at Fourteen Sites in the Lower Verde Valley, Maricopa County, Arizona (1991)
DOCUMENT Full-Text Gregory R. Seymour. Mark Slaughter. WIlliam L. Deaver. Richard V. N. Ahlstrom.

This report documents the results of a testing program completed by SWCA, Inc. Environmental Consultants in August of 1990 in anticipation of the modification of Bartlett Dam. Modifications to the dam were planned as part of the Central Arizona Project's Regulatory Storage Division (Plan 6) and the Safety of Dams Project. During the month of April, 1990, archaeologists from Northland Research, Inc. conducted an archaeological survey of approximately 929 acres located on the Lower Verde River...


Tucson Aqueduct - Phase A, Hohokam Archaeological Sites Cultural Resource Mitigative Data Recovery Studies, Central Arizona Project, 1983/1984 Annual Report (1985)
DOCUMENT Full-Text Donald E. Weaver, Jr.. Richard Ciolek-Torello.

This report summarizes the first year of archaeological studies for the Tucson Aqueduct-Phase A Hohokam sites. A part of the Central Arizona Project, the work was carried out by Museum of Northern Arizona personnel under Contract to the U.S. Bureau of Reclamation. The report summarizes the work accomplished, reviews preliminary research results, suggests modifications to the project research design, and presents a work plan for the second year of the project, September 6, 1984 to September 5,...