Cobble Cluster (Site Type Keyword)
1-3 (3 Records)
The Bureau of Reclamation (Reclamation), United States Department of the Interior, was in the initial stages of the Water Management Project designed to bring Central Arizona Project water to the Gila River Indian Community (GRIC). Under terms of a contract signed in 1992 with the GRIC, facilities designed and constructed by Reclamation would deliver 173,000 acre-feet of water annually onto the reservation. Federal law mandates consideration of potential impacts of such projects upon cultural...
Archaeological Testing Within the Upper Tonto Basin the Rye Creek Project (1989)
The archaeological testing of 19 sites within a 5.4 mile (8.7 km) stretch of State Route 87 in the Upper Tonto Basin of central Arizona provided a wealth of new and significant information on the prehistory of this little known area. The testing was undertaken to determine the cultural significance of the 19 sites prior to an Arizona Department of Transportation road widening and realignment construction project (ADOT Project Number F -053-1-315PE ). Investigated site types include small...
Cultural Resources Survey of Approximately 2.0 Miles of Transmission and Pipeline Right-of-Way and a Well Pad within the Salado Preserve near St. Johns, Apache County, Arizona (2014)
Salt River Project Agricultural Improvement and Power District (SRP) requested that Logan Simpson Design Inc. (LSD) conduct a cultural resources survey prior to the installation of a well pad, a water pipeline right-of-way (ROW), and an electrical transmission line ROW within the Salado Preserve south of St. Johns, Apache County, Arizona. The well pad survey area measures 60 m by 60 m (0.92 acre). The two ROWs are perpendicular to each other and partially overlap. A north to south trending ROW...