Brick Wall (Site Type Keyword)

1-3 (3 Records)

An Archaeological Survey in the Blackwater Area, Volume 2: Site Descriptions and Related Data (1994)
DOCUMENT Full-Text David A. Gregory. Diane L. Douglas.

The Bureau of Reclamation (Reclamation), United States Department of the Interior, was in the initial stages of the Water Management Project designed to bring Central Arizona Project water to the Gila River Indian Community (GRIC). Under terms of a contract signed in 1992 with the GRIC, facilities designed and constructed by Reclamation would deliver 173,000 acre-feet of water annually onto the reservation. Federal law mandates consideration of potential impacts of such projects upon cultural...


Phase I Archaeological Survey of the Hanover Lake Dam Project Area, Fort Dix, Burlington County, New Jersey, and Supplemental Phase I and Phase II Archaeological Investigations at the Hanover Lake Dam Project Area, Fort Dix, Burlington County, New Jersey (2002)
DOCUMENT Full-Text Douglas B. Mooney. Thomas A. J. Crist. Richard L. White. Kimberly Morrell. Petar Glumac.

On behalf of the U.S. Army, the AMEC, Inc. contracted Kise Straw & Kolodner, Inc. (KSK), Inc. to complete a Phase I and Phase II cultural resources surveys within the area of potential effects (APE) for the proposed renovations of Hanover Lake Dam and lead contaminated soil removal at Fort Dix, Pemberton Township, Burlington County. Three areas within the APE are adjacent to the western shore of Hanover Lake and the Hanover Furnace NRHP-listed historic property. This study was completed in...


Prioleau Cemetery Perimeter Wall, Joint Base Charleston Weapons, North Charleston, South Carolina, Conservation Report (2011)
DOCUMENT Full-Text Uploaded by: Rachel Fernandez

In October 2007, Kreilick Conservation, LLC was retained to conserve four grave ledgers in the Prioleau Cemetery, to conduct a structural assessment of the brick perimeter wall of the cemetery, and to prepare specifications for its conservation. The conservation of the ledgers was completed by February 2008, and the structural assessment for the perimeter wall was completed in April 2008. In February 2011. Kreilick Conservation, LLC was retained to complete the conservation treatment of the...