Arbor (Site Type Keyword)

1-2 (2 Records)

Phase I and Phase II Archaeological Data Recovery at Five Sites for the Pinal West to Pinal Central Extra-High Voltage Transmission Line Project, near Casa Grande, Pinal County, Arizona (2013)
DOCUMENT Full-Text Uploaded by: adam brin

Salt River Project Agricultural Improvement and Power District (SRP) has planned and partially constructed an 88-mile-long 500-kV extra-high-voltage transmission line linking the Pinal West, Duke, Pinal Central, Abel, and Dinosaur substations (Arizona Corporate Commission Certificate of Environmental Compatibility, Case No. 126) in south-central Arizona. The transmission line between the Dinosaur and proposed Pinal Central substations has already been constructed; the portion connecting the...


A Preliminary Report on Phase I and Phase II Archaeological Data Recovery at Five Sites for the Pinal West to Pinal Central Extra-High Voltage Transmission Line Project, Pinal County, Arizona (2012)
DOCUMENT Full-Text Chris North. Tina Hart. Michael S. Foster.

Logan Simpson Design Inc., under contract to SRP, completed Phase I archeological data recovery at five sites and Phase II data recovery at two of the sites along the Pinal West To Pinal Central Extra-High Voltage Transmission Line and at the Pinal Central substation site, Pinal County, Arizona. The sites are located south and east of the town of Casa Grande. Three of the sites—AZ AA:1:104(ASM), AZ AA:2:301 (ASM), and AZ AA:2:303(ASM)— are Historic era and two—AZ AA:2:284(ASM) and AZ...