Salt River Project Agricultural Improvement and Power District (SRP) has planned and partially constructed an 88-mile-long 500-kV extra-high-voltage transmission line linking the Pinal West, Duke, Pinal Central, Abel, and Dinosaur substations (Arizona Corporate Commission Certificate of Environmental Compatibility, Case No. 126) in south-central Arizona. The transmission line between the Dinosaur and proposed Pinal Central substations has already been constructed; the portion connecting the proposed Pinal Central and Pinal West substations has not been constructed yet. This report presents the results of Phase I data recovery (extent testing) and Phase II data recovery within a 40-m-wide (130 ft) corridor at three sites located on privately owned lands between the Pinal Central and Pinal West substations and at two sites located within the boundary of the proposed Pinal Central Substation. The sites are situated in central Pinal County south and east of the town of Casa Grande. Logan Simpson Design Inc. (LSD) completed the fieldwork between November 2011 and January 2012.

Cite this Record

Phase I and Phase II Archaeological Data Recovery at Five Sites for the Pinal West to Pinal Central Extra-High Voltage Transmission Line Project, near Casa Grande, Pinal County, Arizona. Michael S. Foster, Chris North. 2013 ( tDAR id: 428045) ; doi:10.6067/XCV8428045

This Resource is Part of the Following Collections

Spatial Coverage

min long: -111.832; min lat: 32.775 ; max long: -111.657; max lat: 32.934 ;

Record Identifiers

ASM Burial Agreement No.(s): 2011-038

SRP PO No.(s): 0000341979

Arizona Corporate Commission Certificate of Environmental Compatibility Case No.(s): 126

LSD Project No.(s): 115395

ASM Accession No.(s): 2011-498

File Information

  Name Size Creation Date Date Uploaded Access
2013_FosterNorth_PhaseIandII_OCR_PDFA_Redacted.pdf 35.17mb Oct 20, 2021 9:10:08 AM Public
This file is a redacted copy.
2013_FosterNorth_PhaseIandII_OCR_PDFA.pdf 43.25mb Jul 15, 2012 Apr 6, 2017 8:55:21 AM Confidential
This file is unredacted.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Salt River Project Cultural Resource Manager

This Resource is Part of the Following User Created Collections