Greystone Environmental Consultants, Inc., on behalf of Salt River Project Agricultural Improvement and Power District (SRP), has developed this Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project (Project) as part of the Certificate of Environmental Compatibility (CEC) Application. SRP contracted with Greystone Environmental Consultants, Inc. (Greystone) to complete the Class I report. The Project includes the construction of one single circuit...
Cultural Resources Survey for the Pinal West to Dinosaur Extra-High Voltage Transmission Line, Pinal County, Arizona (2009)
Class III cultural resources survey for an extra-high voltage transmission line connecting the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur Substations in Pinal County, Arizona.
A Cultural Resources Survey of Approximately 13 Acres for Wire Pulling Locations for a New SRP 230-kV Transmission Line from Kortsen Road to Thornton Road, Casa Grande, Pinal County, Arizona (2013)
Salt River Project Agricultural Improvement and Power District (SRP) requested that Logan Simpson Design Inc. (LSD) perform a Class III cultural resources survey prior to anticipated staging of 18 wire pulling locations for a new 230-kV transmission line from Kortsen Road to Thornton Road for the Desert Basin Generating Station, west of Casa Grande in Pinal County. The Class III survey was undertaken to identify, document and evaluate the Arizona/National Register of Historic Places (A/NRHP)...
A Cultural Resources Survey of Approximately 3 Miles for a New SRP 230-kV Transmission Line from Kortsen Road to Thornton Road for the Desert Basin Generating Station, Casa Grande, Pinal County, Arizona (2009)
SRP requested that Logan Simpson Design (LSD) conduct a Class III cultural resources survey of a new right-of-way (ROW) to determine whether any significant cultural resources will be disturbed by the construction of a 230-kV transmission line. SRP also requested that LSD evaluate portions of four previously recorded sites that are within an existing Western 115-kV transmission line ROW. The new 230-kV transmission line will replace the existing Western line as part of the current project.
Phase I and Phase II Archaeological Data Recovery at Five Sites for the Pinal West to Pinal Central Extra-High Voltage Transmission Line Project, near Casa Grande, Pinal County, Arizona (2013)
Salt River Project Agricultural Improvement and Power District (SRP) has planned and partially constructed an 88-mile-long 500-kV extra-high-voltage transmission line linking the Pinal West, Duke, Pinal Central, Abel, and Dinosaur substations (Arizona Corporate Commission Certificate of Environmental Compatibility, Case No. 126) in south-central Arizona. The transmission line between the Dinosaur and proposed Pinal Central substations has already been constructed; the portion connecting the...
A Preliminary Report on Phase I and Phase II Archaeological Data Recovery at Five Sites for the Pinal West to Pinal Central Extra-High Voltage Transmission Line Project, Pinal County, Arizona (2012)
Logan Simpson Design Inc., under contract to SRP, completed Phase I archeological data recovery at five sites and Phase II data recovery at two of the sites along the Pinal West To Pinal Central Extra-High Voltage Transmission Line and at the Pinal Central substation site, Pinal County, Arizona. The sites are located south and east of the town of Casa Grande. Three of the sites—AZ AA:1:104(ASM), AZ AA:2:301 (ASM), and AZ AA:2:303(ASM)— are Historic era and two—AZ AA:2:284(ASM) and AZ...