Governmental Structure (Site Type Keyword)

Parent: Non-Domestic Structures

Locations, or the remains of buildings that were associated with governmental activities.

1,626-1,650 (1,803 Records)

Response from Stan Graves to Richard Strimel, Carport Construction and Maintenance at 48 Housing Units, Buildings 661-683, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Fort Sam Houston submitted plans to the Texas Historical Commission for carport construction and maintenance at forty-eight housing units located on the historic parade grounds of the Infantry Post area. This letter from the Commission posts questions about the project design.


Response from Stan Graves to Richard Strimel, Construction of Masonry Pillars at Grayson Street, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission wrote this letter to Fort Sam Houston notifying them of their violation of the Section 106 process of the National Historic Preservation Act. The project in question is the recent construction of masonry pillars at the entry to the Infantry Post area of the Landmark District at Grayson Street.


Response from Stan Graves to Richard Strimel, Convenience/Gas Exchange Building, Consolidated General Maintenance Facility, and Brooke Army Medical Center Linear Accelerator, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

This letter states that the Texas Historical Commission is in receipt of documentation describing Fort Sam Houston's project design for the Convenience/Gas Exchange Building, Consolidated General Maintenance Facility, and Brook Army Medical Center's Linear Accelerator. The Commission has decided that there will be "no adverse effect" to the historic districts of Fort Sam Houston and has agreed that the plan can go forward. Carbon copied to this letter is Curtis Trent, Texas Historical...


Response from Stan Graves to Richard Strimel, Correction of Surface Drainage Housing Area 3, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Teresa Kinsey. Stanley O. Graves.

This letter from the Texas Historical Commission is in response to Fort Sam Houston's 95% design drawings and specifications for the project of correction of surface drainage in Housing Area 3. Listed are several concerns regarding the project, as well as recommendations. Carbon copied to this correspondence is Michael Hilger and Dan Prikryl.


Response from Stan Graves to Richard Strimel, Family Housing Improvements Infantry Post Area, Buildings 630, 632, 634, 636, 638, 640, and 642, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Fort Sam Houston submitted plans and specifications to the Texas Historical Commission for the 35% design review of modifications proposed for the family housing in the Infantry Post area. The structures included in the project are buildings 630, 632, 634, 636, 638, 640, and 642. This letter is the Commission's response to the 35% design review and details the recommendations and modifications they would like to impose on the project.


Response from Stan Graves to Richard Strimel, Foulois House Building 107 Replacement Lavatories, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves. Demetrio Jimenez.

This letter confirms that the Texas Historical Commission has received cut sheets of replacement lavatories and the components associated with the lavatories for the non-historic units located in the Foulois House at Fort Sam Houston. After review, the Commission has determined that the replacement elements will have "no adverse effect" on the historic structure.


Response from Stan Graves to Richard Strimel, Foulois House Interior Renovations, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

This letter is a confirmation of a mutual understanding between the Texas Historical Commission and Fort Sam Houston regarding the changes in the scope of work and details of interior renovation of the Foulois House. Carbon copied to this correspondence is Michael Hilger, Army Corp of Engineers.


Response from Stan Graves to Richard Strimel, Housing Area 3 Proposed Modifications and Design Analysis, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Comments contributed by the Texas Historical Commission regarding Fort Sam Houston's submittal of a design analysis of proposed work in Housing Area 3, part of the National Historic Landmark District.


Response from Stan Graves to Richard Strimel, Installation of Handicap Ramp to Building 4015, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Confirmation that the installation of a handicap ramp to the southern entry of Building 4015 as described will have "no effect" on the structure.


Response from Stan Graves to Richard Strimel, Lavatory and Wall Replacement at Brooks Army Medical Center Building 1000, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves. Demetrio Jimenez.

The Texas Historical Commission has received and reviewed the work proposal for the new lavatories and replacement walls at the Medical Center of Brooks Army Base, submitted by Fort Sam Houston. It has been determined that this scope of work will have "no adverse effect" to the historic building.


Response from Stan Graves to Richard Strimel, New Commissary 50 Percent Design Submittal D32, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

The Environmental and Natural Resources Office at Fort Sam Houston forwarded to the Texas Historical Commission design drawings for a new commissary - this was 50% Design submittal (D32). This letter is the Commission's feedback on the design. Carbon copied is Mike Hilger (Base Historical Architect) and Al Smith (DeCA).


Response from Stan Graves to Richard Strimel, New Commissary Site Location Proposal, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

This correspondence by the Texas Historical Commission is aimed at starting a discussion with Fort Sam Houston on their proposal for a new site location for the construction of a "Defense Commissary Agency Superstore." The concern of the Commission is the historically sensitive nature of the site and this letter details these concerns.


Response from Stan Graves to Richard Strimel, Priority List of Buildings to Receive New Roofs, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission received a list from the Environmental Management Office of buildings on the Fort Sam Houston Post which are proposed to receive new roofs in the 1991 fiscal year. This letter is the Commission's feedback on each building and whether or not the project would have "no effect" for each historical structure.


Response from Stan Graves to Richard Strimel, PX Expansion Design, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

This letter gives a lengthy set of recommendations and concerns by the Texas Historical Commission in regards to the design drawings received from Fort Sam Houston for the PX expansion project. Carbon copied to this correspondence is Mike Hilger (Base Historical Architect) and Larry Taylor (AAFES).


Response from Stan Graves to Richard Strimel, Renovation of Second Floor of Quadrangle, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

Design plans and specifications for the renovation of the second floor at the Quadrangle, Building 16, have been received by the Texas Historical Commission. This letter details the Commission's suggestions and comments after review. Carbon copied to this correspondence is Amy Dase, National Register Historian.


Response from Stan Graves to Richard Strimel, Restoration of the Quadrangle, Fort Sam Houston, Texas (1993)
DOCUMENT Full-Text Stanley O. Graves.

Letter confirming that the Texas Historical Commission has received revised specifications for the restoration of the Quadrangle at Fort Sam Houston. Carbon copied is Mike Hilger.


Response from Stan Graves to Richard Strimel, Sallyport Restoration at the Quadrangle, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

The design plans and specifications for the restoration of the sallyport at the Quadrangle, Building 16, were sent by Fort Sam Houston to the Texas Historical Commission. This letter details the Commission's suggestions and comments on the documents submitted.


Response from Stan Graves to Richard Strimel, Security Gate and Fencing Design, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission has received revised plans for the security gate on the perimeter of Fort Sam Houston. If the recommendations in this letter are incorporated into the finalized set of plans, then the Commission will concur with the findings of "no adverse effect."


Response from Stan Graves to Richard Strimel, Staff Post 12 Closet Installation, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission writes that they have received Fort Sam Houston's letter documenting a recent site visit and can now determine "no effect" on Staff Post #12 for the installation of interior bedroom closets.


Response from Stan Graves to Richard Strimel, Structural Repairs to Quarters 115, 35 Percent Review, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Fort Sam Houston submitted plans and related conditional information for the 35% design review of structural repairs to Quarters 115. This letter gives the Commission's recommendations.


Response from Stan Graves to Richard Strimel, Structural Repairs to Quarters 115, 90 Percent Review, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

This letter is the Texas Historical Commission's response to Fort Sam Houston's submittal of their 90% design review submittal for structural repairs to Quarters 115. Carbon copied to this correspondence is Paul McGruff, Army Corps of Engineers, and Claudia Nissley, Advisory Council on Historic Preservation.


Response from Stan Graves to Richard Strimel, Structural Repairs to the Gift Chapel 90 Percent Review, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission has received and reviewed Fort Sam Houston's submitted plans for the 90% design review of structural repairs to the Gift Chapel and construction of a new mechanical building. This letter details the Commission's comments and suggestions pertaining to the submitted plans.


Response from Stan Graves to W.H. Hill, Closing of Field Offices in Building 4011, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

This letter by the Texas Historical Commission respectfully declines to comment on the closing of the Defense Mapping Agency Functions in Building 4011, which does not need coordinating with the Commission. Carbon copied to the letter is Richard Strimel, Environmental Management, Fort Sam Houston.


Response from Stanley Graves and James Steely to John Brenneman, Pocket Guide to the New Post, Fort Sam Houston, Texas (1995)
DOCUMENT Full-Text Stanley O. Graves. James W. Steely.

This letter confirms that the Texas Historical Commission has received from Fort Sam Houston a copy of "A Little More Distinctive: A New Post, Fort Sam Houston" and "Pocket Guide to the New Post, Fort Sam Houston." Copied to this correspondence is John Manguso (Director, Fort Sam Houston Museum) and Mike Hilger (Historical Architect, Fort Sam Houston).


Response from Stanley Graves to David Walker, New Barracks Facility 100 Percent Design Documents, Fort Sam Houston, Texas (1997)
DOCUMENT Full-Text Stanley O. Graves. Sharon E. Fleming.

The Texas Historical Commission has received and reviewed the 100% design documents and finish material samples from Fort Sam Houston for the new barracks facility. This letter details the Commission's comments and recommendations from their review.Copied to this correspondence is David Brigham (Cultural Resources Manager, Fort Sam Houston) and Mike Hilger (Historical Architect, Fort Sam Houston).